Removing the Linecard Expansion Module

Removing the Linecard Expansion Module
To remove a Linecard Expansion Module, follow these steps:
Step 1
Power off the switch.
Step 2
Unscrew the locking screw.
Step 3
Gently pull the LEM ejector till the LEM is slightly ejected.
Step 4
Remove the LEM.
Step 5
Physically insert the linecard expansion blank module to ensure proper system cooling.

Installing and Removing AC Power Supplies

This section provides instructions for installing and removing the AC power supplies for the Cisco MDS
9396T switch.

Installing Power Supplies

To install a power supply, follow these steps:
Before you begin
• HVAC/HVDC power supplies automatically use the same airflow direction as the installed fan modules.
• To implement n+n redundancy, each PSU must be connected to a separate power source. Otherwise,
• There must be an earth ground connection to the chassis to which you are installing the replacement
Step 1
Holding the power supply unit with one hand underneath it and the other hand holding the handle, turn the power supply
so that its release latch is on the right side, and align the back end of the power supply (the end with the electrical
connections) to the open power supply slot. Carefully slide the power supply unit all the way into the slot until it clicks
into place.
Note
If the power supply unit does not fit into the slot opening, turn the unit over and try again.
Step 2
Test the installation by trying to pull the power supply out of the slot without using the release latch.
If the power supply does not move out of place, it is secured in the slot. If the power supply moves, carefully press it all
the way into the slot until it clicks in place.
Step 3
Attach the power cable to the electrical outlet on the front of the power supply.
Step 4
Make sure that the other end of the power cable is attached to the appropriate power source for the power supply. If the
power source has a switch, slide it to the On position.
Cisco MDS 9396T Multilayer Fabric Switch Hardware Installation Guide
36
If the power supply that you are replacing has a different color handle than the replacement power supply,
verify that it has or will have the same airflow direction as the other modules in the switch.
only one power source is required.
module. Typically, the chassis is grounded by its metal-to-metal connection with a grounded rack. If you
need to ground the chassis, see
Grounding the Switch, on page
Installing the Cisco MDS 9396T Switch