Performing A Control Test - Accu-Chek Performa Operator's Manual

Hide thumbs Also See for Performa:
Table of Contents

Advertisement

Performing a Control Test

The meter, a test strip, and control solution are needed.
1. Insert the test strip into the
meter in the direction of the
arrows. The meter turns on.
Note:
Cap color may vary – refer to the control solution package insert.
2. Make sure the code number
on the display matches the
code number on the test strip
container. If the code number
is overlooked, remove the test
strip and reinsert it into the
meter.
or
(example)
3. Select the control solution to
be tested. The level is entered
later.
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents