BMS systems including Danfoss AK-SM 720/ AK-SM 350 and the AK-SM 800 series. The DGS Modbus can be used: • in new buildings/areas that require continuous monitoring.
Page 9
Reverse to close. With DGS-SC a retention strap fixates the sensor element during transportation. Remove it after open- ing the sensor enclosure by pulling the tap of the retention strap.
TxD-/Rxd- Modbus Address To establish Modbus communication to Danfoss front end, configure the address using SW1 and SW2 and perform a network scan from the front end. The Baud rate may need changing. It must be set to 19,200 baud when used with AK-SM 720/AK-SM 350 and when AK-SM 800 is configured in SLV-mode (see manual for AK-SM 800 for further details).
There are two these components while lid is removed and when replacing it. types of bump test. IMPORTANT: If the DGS-SC is exposed to a large leak it should be Quantified: A known concentration of gas is used.
Adjust P3 until the voltmeter equals the voltage calcu- • Screwdriver (depending on housing). lated in section 6.4 Danfoss offers calibration gasses and a kit that consists of a flow 6.7 Calibration of alarm setpoint regulation valve with flexible non-absorbent tubing and vented See section 4.3...
Page 20
Installation and Operation Guide | DGS Modbus Service Read out of refrigerant (Gas) for the DGS is used for Refrigerant Value according to "Danfoss standard list". Gas Full scale in ppm 32000 Fullscale ppm Hours since last calibration 32000 hours...
Installation and Operation Guide | DGS Modbus Appendix C DGS Test Certificate (Example) (Download original from our web site www.danfoss.com. Use in Conjunction with the Danfoss Check Calibration Procedure) Product Description: DGS Serial Number: 12345 Date of First Calibration: (see Rating Label) 25/10/05...
Page 26
Installation and Operation Guide | DGS Modbus Danfoss can accept no responsibility for possible errors in catalogues, brochures and other printed material. Danfoss reserves the right to alter its products without notice. This also applies to products already on order provided that such alternations can be made without subsequential changes being necessary in specifications already agreed.
Need help?
Do you have a question about the DGS-SC and is the answer not in the manual?
Questions and answers