Sequence Of Basic Operations - ONOSOKKI TS-3200A Instruction Manual

Digital torque meter
Table of Contents

Advertisement

3.1 Sequence of Basic Operations

Connect the TS-3200A and a torque detector using the signal cable.
Turn ON the power of the torque detector and the TS-3200A.
(The upper motor of the detector starts rotation.)
Enter parameters of the torque detector. (Refer to 3.2.)
Set parameters of the rotary encoder. (Refer to 3.4.)
Set the zero value of the detector. (Refer to 3.8 and 3.9.)
3-2
(CAPACITY,FACTOR,PULSE)
Set the torque unit. (Refer to 3.3.)
(CAPACITY,SIGNAL,PULSE)
Set the display. (Refer to 3.6.)
(GATE)
Set the analog output. (Refer to 3.10.)
Start measurement.
• Leave the load side of the
detector uncoupled.
• Rotate the upper motor
according to the rotational
direction under measurement.
• Perform coupling of the load
side of the detector.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents