Electrical Wiring - Honeywell RAEGuard 2 PID User Manual

Table of Contents

Advertisement

To reassemble the instrument:
1
Reconnect the 24-pin connector of the ribbon cable and lock it in
place.
2
Fasten the cable to the board.
3
Mate the board with the clip on the left side and tilt it over.
4
Click the board into place.
5
Screw on the sensor, making sure not to block the gas inlet hole
and connectors.
6
Screw on the housing top.
7
Screw down the fastening bolt.
6.3

Electrical Wiring

The detector connects to peripheral equipment via three terminal
blocks. These blocks accept 12AWG to 24AWG wire (0.2 to 4.0
2
mm
).
RAEGuard 2 PID User's Guide
Terminal blocks
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents