Installation - Niles MSU250 Installation Manual

Infrared main system unit
Table of Contents

Advertisement

TINSTALLATION
TOOLS REQUIRED
• 1/8" (0.3cm) Standard Slotted Screwdriver
• Wire Stripper

INSTALLATION

Before you begin, make sure that the sensor/keypad cables, the flasher cables and the 12VDC
power supply cable will all reach the proposed location of the MSU250. Mark the cables with
labels describing where the cable originates (rather than which terminal on the MSU250 it should
connect). For proper installation, follow the steps outlined below in the correct order. If you dis-
cover a fault in the course of installation, go on to the Troubleshooting Guide before continuing with
the next installation step.
To Niles
IR Flasher
To unswitched
AC Outlet
MSU250
WS110 Sensor
8
To 12V DC Power
Supply Plugged into
an switched AC Outlet.
Typically found in
back of a receiver.
Figure 6
MSU250
Installation
MSU250 Sensor
Connection
(CONTINUED ON NEXT PAGE)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents