IDEAL Concord CXA 40/H Installation & Servicing Manual page 24

Hide thumbs Also See for Concord CXA 40/H:
Table of Contents

Advertisement

40 CONTROL BOX - Basic Boiler, Exploded View


"
LEGEND
1.
Wiring clamp.
2.
Connection box plug.
3.
Connection box.
4.
PCB S4561A1054
41 PC BOARD NO. S4561B1054
1. Remove the lower front panel.
2. Undo the 2 screws securing the control box front
panel. Carefully lift it up and lower down.
3. Pull off the 2 plugs and 3 push-on connections from
the board. The board can now be removed by
squeezing in the retaining barbs.
4. Re-assemble in reverse order, ensuring that the
push-on connections are as follows (from left to right):
spark electrode, blank, earth, flame detector.
24
SERVICING
#

!

5.
Terminal strip
6.
Back panel
7.
Lockout reset button
8.
Thermostat knob
Printed circuit board support detail
$

9.
10. Warning light lens
11. Controls box
12. PCB W4115A1020
Earth connection
Retaining
barbs
Concord CXA/H
%
&
'
Potentiometer
Flame detector connection
Plugs
PCB
- Installation and Servicing

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents