IDEAL Concord CXA 40/H Installation & Servicing Manual page 12

Hide thumbs Also See for Concord CXA 40/H:
Table of Contents

Advertisement

13
CASING ASSEMBLY (continued)
4. Fit 3 clips to the top of each side panel.
5. Fit the spire clips to the side casing panels.
6. Hook on the control box to the side panels. Screw in self
tapping screws at the bottom of the control box to fix it to the
side panels.
7. Route the overheat thermostat capillary through the
cable clips as shown. Ensure the phial is correctly
seated in the correct pocket opposite side to the
flow connection. Refer to Frame 9. Secure with the
split pin provided.
8. Route the temperature sensing probe through the
cable clips provided and into the thermostat pocket
adjacent to the flow connection.
Fit the plastic Heyco bush over the sensor lead at
the line shown and insert it into the thermostat
pocket. Ensure that the Heyco bush is correctly
located.
12
INSTALLATION
9. Fit the earth lead to the casing support angle as shown
'
Con 2384
Earth connections
GV1 & GV2 earths
Concord CXA/H
- Installation and Servicing

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents