Danfoss VLT Series FC 102 Installation Manual page 13

Frequency converter
Hide thumbs Also See for VLT Series FC 102:
Table of Contents

Advertisement

Installation
3.8.3 Wiring Procedures
Wiring pocedure for enclosure types A1-A3
1.
Mount the pre-configured cable wires with the
connectors on the fieldbus option. For A1 and A2
enclosures, mount the supplied strain relief on
top of the frequency converter with 2 screws, as
shown in Illustration 3.10. For cable specifications,
refer to chapter 3.8.2 Cable Specifications.
2.
Position the cable between the spring loaded
metal clamps, to establish mechanical fixation
and electrical contact between cable and ground.
Eth erN et
Po rt1
OP CP RT
Eth erN et/
IP
MS
MS 1
MA C-0 0-1
MS 2
SW .ve r.
Illustration 3.10 Wiring for Enclosure Types A1-A3
MG90U402
Installation Guide
Eth erN et
Po rt2
Op tio n
A
B-0 8-0 0-0
0-2 2
Danfoss A/S © Rev. 07/2014 All rights reserved.
Wiring procedure for enclosure types A4-A5, B1-B4, and
C1-C4
1.
Push the cable through the cable glands.
2.
Mount the pre-configured cable wires with the
connectors on the fieldbus option. For cable
specifications, refer to chapter 3.8.2 Cable Specifi-
cations.
3.
Fix the cable to the metal base plate using the
springs, see Illustration 3.11.
4.
Tighten the cable glands securely.
Illustration 3.11 Wiring for Enclosure Types A4-A5, B1-B4, and
C1-C4
3
3
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents