Download Print this page

OLT 8x8 Cedar Assembly Manual page 21

Advertisement

41.
Before installing completed Ridge Board, note that dado cut is off center. Orientate Ridge Board with
high side to top before lifting. See illustration above.
Dado cuts line up
Notch
42.
Drop Ridge Board into King Stud notch. Dado cut of Ridge Board should line up with dado cut of
Rafters. From outside, Ridge Board ends should be flush with outside of Rafters. King Stud / Gable Support
Frame may need to re-positioned in order to accommodate the Ridge Board correctly. If so, undo tacked in
screws and position to fit. Complete securing using 6 - 2" in Support and 2 - 3" screws in King Stud. Secure
Rafters to Ridge Board by angle screwing from Rafter into Ridge Board as shown above with 2 - 3" screws
per Rafter.
43.
Install remaining Part W - Side Polygal Windows - 21" wide. Position as per Step 24-25.
Correctly orientate Polygal Windows as per instructions on the Window's protective sheathing.
Toll Free 1-888-658-1658
Make sure Support
does not block
Roof Window from
sliding up dado cut.
King Stud/ Support may
need to be re-positioned.
www.outdoorlivingtoday.com
Page 21
High Side
Flush
sales@outdoorlivingtoday.com
angle 3"
screw

Advertisement

loading