Download Print this page

OLT 8x8 Cedar Assembly Manual page 12

Advertisement

18.
Repeat Steps 16-17 to complete opposite Side Top Support pieces.
Doorway Opening
= 32" from 2x4's.
20.
Locate Part J - Front Wall Top Cap - 1 1/2" x 5 1/2" x 25 3/8" - Right Side. Position on top
of Front Wall so dado cut of Cap lines up with dado cut of Corner and Doorway Post. Note - the cap
has a slight bevel cut that will be facing to the outside to direct water away from the Greenhouse.
Attach with 3 - 3" screws in dado cut line on slight angle. Sink screw head below wood so Polygal
window sits down in the dado cut.
Toll Free 1-888-658-1658
www.outdoorlivingtoday.com
Page 12
19.
Measuring from the
outside of Corner Post 4x4's,
your Greenhouse should have
a footprint ideally of
96" wide x 95 1/2" deep.
There can be small tolerances
when connecting post/walls
together resulting in a variation
on the depth of approx. 1/2".
If using Wood Foundation
Posts supplied, screw walls
down onto foundation with
2 - 3" screws per panels.
Line Dado cut
of Cap with
Dado cut of
Corner and
Doorway Post.
sales@outdoorlivingtoday.com

Advertisement

loading