Rinnai Enduro SP200B Installation Manual

Rinnai Enduro SP200B Installation Manual

Rinnai split solar hot water systems flat plate collectors
Hide thumbs Also See for Enduro SP200B:

Advertisement

This system shall be installed in accordance with:
• Manufacturer's Installation Instructions
• Current AS/NZS 3500
• All applicable local rules and regulations including local OH&S requirements
This system must be installed, commissioned and serviced by an Authorised Person.
The solar hot and solar cold pipes between the solar storage tank and the
solar collectors must be suited to the high water temperatures and pressures
that may occur. As such, plastic pipe must not be used.
IMPORTANT
Components used to join pipes must use metallic materials to achieve sealing.
Not suitable as a pool or spa heater.

Installation Manual

Rinnai Split Solar Hot Water Systems -
Enduro SP200B, Enduro XL SP250B
and Excelsior SP200BEX
Flat Plate Collectors
Issue
4
AS/NZS 2712
SMK.1849
SAI Global

Advertisement

Table of Contents
loading

Summary of Contents for Rinnai Enduro SP200B

  • Page 1: Installation Manual

    Installation Manual Rinnai Split Solar Hot Water Systems - Enduro SP200B, Enduro XL SP250B and Excelsior SP200BEX Flat Plate Collectors This system shall be installed in accordance with: • Manufacturer’s Installation Instructions • Current AS/NZS 3500 • All applicable local rules and regulations including local OH&S requirements This system must be installed, commissioned and serviced by an Authorised Person.
  • Page 2: Table Of Contents

    Full instructions on the installation of the complete system can be found in the “Operation / Installation Manual - Rinnai Split Solar Hot Water Systems”� All information and warnings in the “Operation / Installation Manual - Rinnai Split Solar Hot Water Systems” are applicable to this installation�...
  • Page 3: Specifications

    For locations where the warranty booklet specifies collector Option B, the frost valves specified by Rinnai must be fitted and are supplied with the appropriate installation kit. Frost Protection If frost valves are missing you must obtain them and fit them.
  • Page 4: InstallationInformation

    INSTALLATION INFORMATION REGULATIONS AND OCCUPATION HEALTH AND SAFETY (OH&S) Installation and commissioning must be performed by authorised persons. Rinnai solar systems must be installed in accordance with these instructions and all regulatory requirements which exist in your area including those in relation to manual lifting, working at heights and on roofs.
  • Page 5: Roof Mounting Options

    Structures” in relation to these specifications. A solution may be provided using either kit DDHRKIT2 (2 collector) or DDHRKIT3 (3 collector), in accordance with the instructions in the Rinnai document “High Rise Roof Mounting Frame Installation Instructions (Part Number 15401103) StandardInstallation Installation details are in the section 'Collector Installation' on page 10.
  • Page 6 INSTALLATION INFORMATION Mounting Location Suitability The following table indicates which installation locations are suitable for different roof mounting options for Rinnai split solar hot water systems. Region Region Region Region Wind Region Roof Area (see page "Roof Area" Area Area...
  • Page 7 Area 2 Area 1 Area 3 In both examples : A = min of 0.2 x 20.3 = 4.06 0.2 x 12.1 = 2.42 1 x 3.8 = 3.8 A = 2.42 è A/2 = 1.21 m Rinnai Split Collector IM...
  • Page 8: Water Pipes, Fittings And Insulation

    All hot water pipework should be insulated with sealed polyethylene foamed or equivalent insulation to optimise performance and energy efficiency, and to protect against frost damage. Such insulation may also be mandatory under local regulations. Rinnai recommend insulation to achieve at least the R value shown in the following table. Pipe between Location of Installation...
  • Page 9: Connecting Fittings To Collector

    B screwing onto the Join the barrel union components together. threaded end of the header. Tighten with two spanners in the places indicated Tighten with two spanners in the places indicated in the diagram above. in the diagram above. Rinnai Split Collector IM...
  • Page 10: CollectorInstallation

    Attach the collector mounting straps to the rafter or truss under the tiles. Nail strap to rafter Replace the tiles and ensure the collector is secure, and the roof is weather tight. Rinnai Split Collector IM...
  • Page 11: Fastening Collectors To A Metal Roof

    Apply some silicone sealant down the holes to ensure no water leakage and secure with suitable fasteners. Alternatively the rail can be attached to the roof using the collector mounting straps. Rinnai Split Collector IM...
  • Page 12: Sp200B, Sp250B Or Sp200Bex Installation Kits - Biksp1Coll And Biksp1Collft

    COLLECTOR INSTALLATION 1 SP200B, SP250B OR SP200BEX INSTALLATION KITS - BIKSP1COLL AND BIKSP1COLLFT Installer Supplied Copper Pipe & Insulation Installer Supplied Copper Pipe & Insulation Rinnai Split Collector IM...
  • Page 13 Hot Sensor Assembly 10204715 Collector Mounting Straps 12401012 M8 Bolt, Washer and Nut Bolt 22601052 Washer 17401072 (Used to fasten collector Hot Sensor Lead (20m) 31002715 Nut 16801062 mounting straps to rail) Solar Collector 16001011 Installation Manual 15401113 Rinnai Split Collector IM...
  • Page 14: Sp200B Or Sp200Bex Installation Kits - Biksp2Coll And Biksp2Collft

    COLLECTOR INSTALLATION 2 SP200B OR SP200BEX INSTALLATION KITS - BIKSP2COLL AND BIKSP2COLLFT Installer Supplied Copper Pipe & Insulation Installer Supplied Copper Pipe & Insulation Rinnai Split Collector IM...
  • Page 15 Collector Mounting Straps 12401012 M8 Bolt, Washer and Nut Bolt 22601052 Washer 17401072 (Used to fasten collector Hot Sensor Assembly 10204715 Nut 16801062 mounting straps to rail) Solar Collector Hot Sensor Lead (20m) 31002715 Installation Manual 15401113 Rinnai Split Collector IM...
  • Page 16: Sp250B Installation Kits - Biksp2Collxl And Biksp2Collxlft

    COLLECTOR INSTALLATION 2 SP250B INSTALLATION KITS - BIKSP2COLLXL AND BIKSP2COLLXLFT Installer Supplied Copper Pipe & Insulation Installer Supplied Copper Pipe & Insulation Rinnai Split Collector IM...
  • Page 17 Collector Mounting Straps 12401012 M8 Bolt, Washer and Nut Bolt 22601052 Washer 17401072 (Used to fasten collector Hot Sensor Assembly 10204715 Nut 16801062 mounting straps to rail) Solar Collector Hot Sensor Lead (20m) 31002715 Installation Manual 15401113 Rinnai Split Collector IM...
  • Page 18: Sp200B Or Sp200Bex Installation Kits - Biksp3Coll And Biksp3Collft

    COLLECTOR INSTALLATION 3 SP200B OR SP200BEX INSTALLATION KITS - BIKSP3COLL AND BIKSP3COLLFT Installer Supplied Copper Pipe & Insulation Installer Supplied Copper Pipe & Insulation Rinnai Split Collector IM...
  • Page 19 Collector Mounting Straps 12401012 M8 Bolt, Washer and Nut Bolt 22601052 Washer 17401072 (Used to fasten collector Hot Sensor Assembly 10204715 Nut 16801062 mounting straps to rail) Solar Collector Hot Sensor Lead (20m) 31002715 Installation Manual 15401113 Rinnai Split Collector IM...
  • Page 20: ContactInformation

    P.O. Box 460 Braeside, Victoria 3195 Rinnai has a Service and Spare Parts network with personnel who are fully trained and equipped to give the best service on your Rinnai appliance. If your appliance requires service, please call our National Help Line. Rinnai recommends that this appliance be serviced every 3 years.

This manual is also suitable for:

Enduro xl sp250bExcelsior sp200bex

Table of Contents