Operating Environment - ETC Paradigm Connect And Set Up

Touchscreen interface
Hide thumbs Also See for Paradigm:
Table of Contents

Advertisement

E T C S e t u p a n d C o n n e c t G u i d e

Operating Environment

• 0-50°C, 10-95% non-condensing humidity environment.
Help f rom ETC Technical Services
If you experience difficulty during setup or installation of the Paradigm Touchscreen Interface, additional
information is available from www.etcconnect.com, or by contacting ETC Technical Services at your
local office listed on the bottom of this page.
S e t u p a n d C o n n e c t
Step 1:
Step 2:
Step 3:
Step 4:
Step 5:
Step 6:
Step 7:
P - T S I I n i t i a l P ow e r - u p
To power-up the Paradigm
Because ETC has prepared the P-TSI at the factory prior to shipment, on initial power-up, the Paradigm
Virtual Touchscreen application loads.
Par ad ig m To uch scr e en I nt e rf a ce Set up an d Conn ec t Gu id e Pa ge 2 of 12
Connect an Ethernet cable (not provided) between the Touchscreen Interface "Net3
Network" receptacle and the network switch that is also connected to the Paradigm
Central Control Server (P-CCS).
Setup the external touchscreen monitor (by others) following the manufacturers provided
instructions.
Connect the external touchscreen monitor digital video interface (DVI) connector to the
Touchscreen Interface "DVI" receptacle.
Connect the external touchscreen monitor USB cable (providing touchscreen
functionality) to a Touchscreen Interface USB port.
Locate the power supply and IEC power supply cable.
Insert the power supply round plug into the Touchscreen Interface "12V DC" receptacle,
located on the top left corner of the unit rear panel. Tighten the lock ring around the
receptacle for a secure installation.
Using the IEC power cable required for your region, insert the receptacle end into the
power supply and the plug end into the power source.
®
Touchscreen Interface, press the power button
®
Paradigm
To continue with selecting a Virtual Touchscreen configuration,
touch to select the "Central Control Server" from the
"Discovered Servers" list. Reference the Paradigm Virtual
Touchscreen Setup Guide for instructions to use the P-VTS
software.
To update the Virtual Touchscreen application, to change IP or
network settings, or for additional advanced features and
troubleshooting, touch the [Quit] button on the bottom right
corner of the P-VTS application. The P-VTS software
application closes and the Application Shell displays.
Touchscreen Interface
on the front panel.
El ect r on ic T he at r e Con tr o ls , I nc.

Advertisement

Table of Contents
loading

Table of Contents