Handling - ABB VD4 12 Installation And Service Instructions Manual

Vd4 series 12 - 24 kv; 630 - 2500 a; 16 - 31.5 ka
Table of Contents

Advertisement

4. Handling

Before carrying out any operations, always make
sure that the operating mechanism springs are
discharged and that the apparatus is in the open
position.
To lift and handle the circuit-breaker, proceed as
follows (fig. 2):
– use a special lifting tool (1) (not supplied) fit-
ted with ropes with safety hooks (2);
– insert the hooks (2) in the supports (3) fixed to
the frame of the circuit-breaker and lift. Put the
hooks (2) into the support holes (3) according
to the type of apparatus (see table);
– on completion of the operation (and in any case
before putting into service) unhook the lifting
tool (1) and dismantle the supports (3) from
the frame.
3
2
1
Fig. 2
Fig. 3
During handling, take great care not to stress
the insulating parts and the terminals of the cir-
cuit-breaker.
The apparatus must not be handled by
!
putting lifting devices directly under the
apparatus itself. Should it be necessary
to use this technique, put the circuit-
breaker onto a pallet or a sturdy sup-
porting surface (see fig. 3).
In any case, it is always advisable to
carry out lifting using the supports (3).
C
B
Version
Pole centre distance
Fixed
150-210 mm
Fixed
275 mm
Fixed
210 mm
Withdrawable 150 mm
Withdrawable 210 mm
Withdrawable 275 mm
Withdrawable 275 mm
Withdrawable 210 mm
A
3
Rated current
up to 1250 A
from 1600 to 2500 A
from 1600 to 2000 A
up to 1250 A
from 1600 to 2500 A
up to 1250 A
from 1600 to 2500 A
up to 1250 A
Hole
A
A
A
A
B
B
C
C
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vd4 17Vd4 24

Table of Contents