Assembly - Redback 106485 Operation Manual

120v lithium ion cordless blower
Table of Contents

Advertisement

2
1
BLOWER
BLOWER
PIPE
Figure 1
Figure 3

Assembly

Installing and Removing the Blower Pipe
Tools are not required to install the blower pipe (see Figure 1).
Attach the blow pipe into the connecting piece and secure by
turning it in clockwise direction. For storage the blow pipe can be
removed.
Assembling and Adjusting the Shoulder Belt
Open retaining hook and hook onto the fastening eye on the
housing (see Figure 2). Depress tabs on either side of the retaining
clasp to adjust the shoulder belt to your height then slide the
retaining clasp up or down and release the tabs.
Inserting/Replacing the Battery
Charge the battery as described in the charger operation manual.
Press the charged battery into the power tool until it clicks into
place (see Figure 3).
To remove the battery, press the release button
battery
.
2
2
Protect the battery contacts when the battery is not being used.
Metal objects may short-circuit the contacts and pose
1
Figure 2
!
CAUTION
both an explosion and fire hazard!
and pull out the
1
7

Advertisement

Table of Contents
loading

Table of Contents