IBM Slicestor 2448 Appliance Operation Manual page 25

Table of Contents

Advertisement

v Left and right cabinet section assemblies
v Left and right chassis section assemblies
Install the handles on the server
You must install two handles on each side of the server before lifting it.
CAUTION:
Make sure that you have adequate support to lift the system. Releasing it before it is fixed in the rack
might cause personal injury or damage the equipment.
To install the handles on the server, do the following steps.
1. Take out the handle carriers on the rear side by releasing the thumb screws, as shown in the
following figure.
Figure 2. Remove handles from handle carriers
2. Remove all four handles from the two carriers.
3. Install side handles on both sides of server and make sure that they are securely tightened before
lifting the server.
CAUTION:
Before lifting or transporting the server, make sure the four side handles (two on each side) are
securely screwed into the server. Failure to do so can result in severe personal injury and server
damage.
When you are ready to install the server in the rack, you must use a lifting device. Alternatively, use four
individuals, each lifting the server by the side handles to place the server in position and begin inserting
it into the rack rails.
After the server is partially inserted into the rack rails, you must remove the server side handles to fully
insert the server into the rack. Then, you can place the handles back in the drive carriers and replace the
carriers into the back of the server.
See "Unlock the rails to insert or remove the chassis" for more details on how to install the server into the
rack rails.
Chapter 3. Install the appliance into a rack
7

Advertisement

Table of Contents
loading

Table of Contents