Check The Power Source - Raypak 241275 Installation And Operating Instructions Manual

Cold water start and cold water run for hi delta & mvb heaters & boilers
Table of Contents

Advertisement

Injection & Heater Pump Comparison — Hi Delta
Heater
Flow
Model
302
32
402
34
502
42
652
55
752
63
902
76
992
83
1262
107
1532
120
1802
120
2002
132
2072
132
2342
132

Check the Power Source

WARNING: Using a multi-meter, check the follow-
ing voltages at the circuit breaker panel prior to con-
necting any equipment. Make sure proper polarity is
followed and house ground is proven.
BLACK
WHITE
A B C
Fig. 10: Wiring Connections
Heater Pump
Temp. Rise Press. Drop
16
2
20
2
20
2.3
20
4.1
20
5.7
20
8.4
20
5.2
20
9.6
22
12.4
25
13
26
19
27
19
30
21.4
Table B: Injection and heater pump specifications
CIRCUIT
BREAKER
GREEN
GROUND
Injection Pump
Flow
Temp. Rise
13
40
17
40
22
40
28
40
32
40
38
40
42
40
54
40
62
42
68
45
74
46
75
47
80
50
Check the power source:
AC = 108 VAC Minimum, 132 VAC MAX
AB = 198 VAC Minimum, 250 VAC MAX
BC = 108-132 VAC Maximum
Fig. 11: Multi-meter
11
Injection
Heater Pump
Pump
1
1911-
hp
112
4
1
1911-
hp
112
4
1
1911-
hp
1630 4.0
4
1
1911-
hp
1630 4.0
4
1
1911-
hp
1630 4.2
4
1
1911-
hp
1630 4.2
4
1
1911-
hp
1630 4.7
4
1
1911-
hp
1630 4.7
3
1
1911-
hp
1632 5.6
3
1
1911-
hp
1632 5.6
3
3
1935-
hp
1634 6.1
4
3
1935-
hp
1634 6.1
4
3
1935-
hp
1634 6.1
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000.57a

Table of Contents