LiteOn PF-2123-1LDM Startup Manual

3-phase, dual-input 6-slot power supply system
Hide thumbs Also See for PF-2123-1LDM:

Advertisement

Quick Links

3-Phase, Dual-Input 6-Slot Power
Supply System
S T A R T U P G U I D E
Page 1 of 10
PF-2123-1LDx-ST-01
November 2016

Advertisement

Table of Contents
loading

Summary of Contents for LiteOn PF-2123-1LDM

  • Page 1 3-Phase, Dual-Input 6-Slot Power Supply System S T A R T U P G U I D E Page 1 of 10 PF-2123-1LDx-ST-01 November 2016...
  • Page 2: Table Of Contents

    PF-2123-1LDx S T A R T U P G U I D E 6-Slot Power Supply System © 2016 Copyright Lite-On Technology Corporation ALL RIGHTS RESERVED. Lite-On is a trademark of Lite-On Technology Corporation, registered in the United States and other countries. This document may contain inaccuracies and typographical errors. Lite-On cannot be held responsible for any errors or omissions contained in this document.
  • Page 3: Introduction

    3-phase, Dual-Input Power Configuration Model Number EU Model, 346/ 360/ 380/ 400/ 415VAC PF-2123-1LDM US Model, 200/ 208/ 220/ 230/ 240VAC PF-2123-1LDN The 2.5kW PSUs efficiently supply both main output DC power and standby DC power from either AC or DC sources.
  • Page 4 PF-2123-1LDx S T A R T U P G U I D E 6-Slot Power Supply System • Protect equipment objects falling through or liquids dripping into the openings. This could cause a fire or electrical shock. • Disconnect equipment from power supply before cleaning. Do not use any liquid or aerosol cleaner. Use only moistened cloth.
  • Page 5: Required Tools For Startup

    PF-2123-1LDx S T A R T U P G U I D E 6-Slot Power Supply System • Do not dispose of electrical appliances as unsorted municipal waste, use separate collection facilities. Contact your local government for information regarding the collection systems available.
  • Page 6: Initial Power Activation

    C13 Receptacles Model (as viewed from rear of Power Shelf) PF-2123-1LDN; B (L2) – C (L3) Left C13 receptacles PF-2123-1LDM; C (L3) – N PF-2123-1LDN; A (L1) –B (L2) Right C13 receptacles PF-2123-1LDM; A (L1) – N Page 6 of 10...
  • Page 7: Installing Power Supply Units

    PF-2123-1LDx S T A R T U P G U I D E 6-Slot Power Supply System To verify correct voltage on the C13 receptacles: • With a DMM, verify that the C13 receptacles have power as described in the table above. C13 Receptacles C13 Receptacles Installing Power Supply Units...
  • Page 8: Psu Led Status

    PF-2123-1LDx S T A R T U P G U I D E 6-Slot Power Supply System 6. Turn on any connected devices to the Power Shelf and verify that the Power System is providing power to the devices. 7. Refer to the Lite-On 3-Phase 12.5kW Power Supply System User Guide to install any other devices to the Power System.
  • Page 9: Related Documentation

    For instructions on installing and using the 3-Phase 12.5kW Power Supply System, refer to the Lite-On 3-Phase 12.5kW Power Supply System User Guide. For more information related to the Lite-On Power Systems, visit the Lite-On Power Systems Solutions web site at: http://www.liteon-pss.com. Page 9 of 10 PF-2123-1LDx-ST-01...
  • Page 10: November

    Lite-On Power System Solutions 3001 Summit Ave, Suite 400 No. 90, Chien 1 Rd., Chung Ho Dist Plano, TX 75074 New Taipei City 23585, Taiwan +1 (469) 331-9838 +886 -2-2226181 ext 5026 www.liteon-pss.com www.liteon-pss.com email: pss.sales@liteon.com email: pss.sales@liteon.com Page 10 of 10...

This manual is also suitable for:

Pf-2123-1ldn

Table of Contents