LiteOn PF-2123-2 Startup Manual

3-phase, 10-slot power supply system

Advertisement

Quick Links

3-Phase, 10-Slot Power Supply System
S T A R T U P G U I D E
Page 1 of 10
PF-2223-1-ST-02
July 2015

Advertisement

Table of Contents
loading

Summary of Contents for LiteOn PF-2123-2

  • Page 1 3-Phase, 10-Slot Power Supply System S T A R T U P G U I D E Page 1 of 10 PF-2223-1-ST-02 July 2015...
  • Page 2: Table Of Contents

    PF-2123-2, PF-2223-1 S T A R T U P G U I D E 10-Slot Power Supply System © 2015 Copyright Lite-On Technology Corporation ALL RIGHTS RESERVED. Lite-On is a trademark of Lite-On Technology Corporation, registered in the United States and other countries. This document may contain inaccuracies and typographical errors. Lite-On cannot be held responsible for any errors or omissions contained in this document.
  • Page 3: Introduction

    PF-2123-2, PF-2223-1 S T A R T U P G U I D E 10-Slot Power Supply System Introduction The 3-Phase Power Supply System is a 10-slot chassis with 2.5KW Power Supply Units (PSUs) that provides stable DC output power. This 21-inch power system uses up to 10 high-power, hot-swappable PSUs for flexibility in full power or redundant operation.
  • Page 4: Required Tools For Startup

    PF-2123-2, PF-2223-1 S T A R T U P G U I D E 10-Slot Power Supply System Required Tools for Startup There are NO USER SERVICEABLE PARTS inside the Power Shelf or Power Supply Units. All repairs and service must be performed by AUTHORIZED SERVICE PERSONNEL only.
  • Page 5: Initial Power Activation

    PF-2123-2, PF-2223-1 S T A R T U P G U I D E 10-Slot Power Supply System Conditions to be Met before Initial Startup Yes? Have all components to be installed been stored in a dry area? Is the air temperature within normal operating range?
  • Page 6 PF-2123-2, PF-2223-1 S T A R T U P G U I D E 10-Slot Power Supply System Input Power Connector Pinout AC Input L1 (R) AC Input L2 (S) AC Input L3 (T) Neutral Frame Ground 3-Phase, 5-Wire System (with neutral) PF-2223-1L1M –...
  • Page 7: Shelf Power Activation

    PF-2123-2, PF-2223-1 S T A R T U P G U I D E 10-Slot Power Supply System 3-Phase, 4-Wire System (without neutral) PF-2223-1L1N – 10 slot single input PF-2123-2LNN – 5+5 slot single input L1–L2 L2–L3 L3–L1 PF-2223-1LDN – 10 slot dual input...
  • Page 8: Installing Power Supply Units

    PF-2123-2, PF-2223-1 S T A R T U P G U I D E 10-Slot Power Supply System C13 Receptacles Phase A C13 Receptacles Phase C Installing Power Supply Units After power has been activated and verified, PSUs can be installed into the Power Shelf. A PSU can be plugged into any slot in the Power Shelf and they are keyed so they cannot be inserted incorrectly.
  • Page 9: Related Documentation

    PF-2123-2, PF-2223-1 S T A R T U P G U I D E 10-Slot Power Supply System Related Documentation For information about the 22.5kW Power Shelf, refer to the Lite-On 22.5kW Power Shelf Datasheet. For information about the 2.5kW Power Supply Unit, refer to the Lite-On 2.5kW Power Supply Unit Datasheet.
  • Page 10 PF-2123-2, PF-2223-1 S T A R T U P G U I D E 10-Slot Power Supply System Innovative Power Management Solutions for Critical Infrastructure Lite-On Power System Solutions Lite-On Power System Solutions 3001 Summit Ave, Suite 400 No. 90, Chien 1 Rd., Chung Ho Dist...

This manual is also suitable for:

Pf-2223-1

Table of Contents