Hand Over Document - Hally-Gally Piccolo Assembly Instructions Manual

With special installation frame
Hide thumbs Also See for Piccolo:
Table of Contents

Advertisement

14 Hand Over Document

After the installation of the equipment pass the installation and maintenance documents
to the operator. The operator has to receive the hand over documents. The complete
filled and signed hand over document should be sent to the supplier.
Art.-No.:
Type of Item: Trampoline "Piccolo" Special Installation Frame
Serial Number: _______________________________________________________
Customer or Operator (Town, Council, School, etc.):
___________________________________________________________________
___________________________________________________________________
Competent Person in Charge:
___________________________________________________________________
___________________________________________________________________
Installation Company (Address):
___________________________________________________________________
___________________________________________________________________
Responsible Assistant (Assembler):
___________________________________________________________________
___________________________________________________________________
Received the complete assembly instructions, maintenance instructions and mainte-
nance printout
___________________________________________________________________
(Signature of Operator)
(Stamp)
Date: _____________________
T:\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\20_02_116-01-en-000.doc
SPOGG Sport-Güter GmbH • Schulstr. 27 • 35614 Aßlar/Berghausen
spogg@hally-gally-spielplatzgeraete.de
www.hally-gally-spielplatzgeraete.de
20.02.116
(Signature of Installation Company)
- 37

Advertisement

Table of Contents
loading

This manual is also suitable for:

20.02.116

Table of Contents