15 Hand over document
After the installation of the equipment pass the installation and
maintenance documents to the operator. The operator has to receive the
hand over documents. The complete filled and signed hand over
document should be sent to the supplier.
Art.-No.:
Type of item: Trampoline Piccolo
Serial number: _________________________________________________
Customer or operator (Town, Town council, Kindergarten, etc.):
______________________________________________________________
______________________________________________________________
Competent person in charge:
______________________________________________________________
______________________________________________________________
Installation company (address):
______________________________________________________________
______________________________________________________________
Responsible assistant (assembler):
______________________________________________________________
______________________________________________________________
Received the complete assembly instructions, maintenance instructions and
maintenance printout .
______________________________________________________________
(Signature of operator)
(Stamp)
Date: ___________________
T:\PLAY\Play Installation Instructions\Word Document Install Prints\Piccollo 20-02-118.doc
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany
seiltechnik@huck.net
20.02.118
(Signature of installation company)
• www.huck.net
- 28 -