FCC Compliance (XTT910)
For FCC compliance:
Ensure the comms cable is routed through a separate grommet to the power
cable.
Ensure that you use a CE approved Power Supply Unit.
Arc Suppression
Snubber devices are recommended for EMF Flyback and Arc Suppression when
driving an inductive load with the Relay, see Figure 2.
Installing the Battery into the Power Supply Combo (IPS910)
1.
Open the Lid of the Cabinet.
2.
Slide the Lid in an upwards direction and unhinge.
3.
Place the Battery into the Cabinet with the Battery Terminals in an upwards
position.
4.
Connect the Red Battery Terminal Lead to the Positive Battery Terminal.
5.
Connect the Black Battery Terminal Lead to the Negative Battery Terminal.
6.
Re-hinge the Lid and slide it in a downwards direction.
7.
Close the Lid of the Cabinet.
Mounting the ImproX TT
CAUTION:
Make certain that you mount the Terminal on a vibration-free
surface.
NOTE:
The ImproX TT can be mounted onto virtually any surface including metal.
Select the mounting position of the ImproX TT Terminal, considering accessibility,
routing of wires and visibility of the LEDs.
Open Frame Construction (XTT900)
Secure the Mounting Plate to the mounting surface, using four suitable screws and wall
plugs, nuts and bolts or rivets.
XTT300-0-0-GB-16
Figure 2: EMF Flyback and Arc Suppression
January 2011
Page 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents