Installation Of Control Board - Xiaomi Ninebot mini Service Manual

Hide thumbs Also See for Ninebot mini:
Table of Contents

Advertisement

3.19Installation of control board:

The cable of gravity sensor is connected to the controller , place the control board
after making sure that all the wires are outside, make sure that the controller is installed
in place of the cabin DB9 port connected to the display cabin. Buckle up the motor
assembly and lamp cables, connect the three-phase wires and make sure that stuck in
the clamps.(Note: the same color wires of the three-phase motor are connected properly)

Advertisement

Table of Contents
loading

Table of Contents