XD – XD D HEATERS
( TO BE DISPLAYED NEXT TO THE CONTROL UNIT )
START-UP :
Open the main gas valve.
Switch the power on.
Start the heater ignition cycle.
If the flame is not lit after 45 seconds, start a second ignition cycle.
If the flame is still not lit or goes out, close the main gas valve, switch
the power off and call your SBM installer.
SHUT OFF :
Close the main gas valve.
Switch the power off.
MAINTENANCE :
To be performed once a year by your SBM installer, according to the
SBM INSTALLER INSTRUCTIONS Nr. 05000376.
Manufacturer :
SBM
3 cottages de la Norge 21490 CLENAY - FRANCE
Agent :
GAS INFRARED HEATERS
USER GUIDE
Nr 05000375/5
M A N U A L O P E R A T I O N
Installer's stamp :
1312