Step 9 Roll the machine out of the crate base to where you are going to setup.
Step 10 Remove the X-axis restraining strips.
Step 11 Screw 4 holding stand on the ground and adjust the level.
Step 12 Save the crate for shipping in the future.
2.2 Contents and Accessories Checklist
Please check to ensure that all of the following items are included within the shipping crate. If any
of the following items are missing, immediately contact your local GCC distributor.
Main Power Cord
*Power installation requires a certified electrical technician.
USB Cable
Ethernet Cable
CO2 Goggle
Lens Cleaner
Cotton Swabs
Focusing Tool
Lens Cleaning Paper
Cutting Table Supporting Bars
Quality Promise Card
User's Guide Disk (Driver included )
QuickALIGN Switch
Key for Laser Firing Control
Hose Clamp 8 1/2"
Water Chiller Tubing - 7M (Diameter:1/2 inch)
Focal Lens Removal Tool
Item
16
Quantity
1
1
1
1
1
1
1
1
15
1
1
1
2
4
1
1
232001260G(10)