Wiring - Main Power; Wiring - Low Voltage Wiring; Figure 14 Component Location; Table 3 Operating Voltage Range - Bard QA241D Installation Instructions Manual

Qtec series packaged air conditioner
Table of Contents

Advertisement

WIRING – MAIN POWER
Refer to the unit rating plate and/or Table 2 for wire
sizing information and maximum fuse or "HACR Type"
circuit breaker size. Each unit is marked with a
"Minimum Circuit Ampacity". This means that the
field wiring used must be sized to carry that amount of
current. Depending on the installed KW of electric
heat, there may be two field power circuits required. If
this is the case, the unit serial plate will so indicate. All
models are suitable only for connection with copper
wire. Each unit and/or wiring diagram will be marked
"Use Copper Conductors Only". These instructions
MUST BE adhered to. Refer to the National Electrical
Code (NEC) for complete current carrying capacity data
on the various insulation grades of wiring material. All
wiring must conform to NEC and all local codes.
The electrical data lists fuse and wire sizes (75° C
copper) for all models, including the most commonly
used heater sizes. Also shown are the number of field
power circuits required for the various models with
heaters.
The unit rating plate lists a "Maximum Time Delay
Relay Fuse" or "HACR Type" circuit breaker that is to
be used with the equipment. The correct size must be
used for proper circuit protection, and also to assure that
COMPONENT LOCATION
ELECTRIC
HEATERS
UNIT
MOUNTED
THERMOSTAT
LOCATION
DEHUMIDIFICATION
CONTROL
(OPTIONAL)
Manual
2100-438
Page
14
FIGURE 14
SIDE FIELD WIRE
ENTRANCE
REMOTE
THERMOSTAT
TERMINAL
BLOCK
INDOOR
BLOWER
CIRCUIT
BREAKER PANEL
& CONTROLS
MIS-1577
there will be no nuisance tripping due to the momentary
high starting current of the compressor motor.
The disconnect access door on this unit may be locked
to prevent unauthorized access to the disconnect.
See Start Up section for information on three phase
scroll compressor start-ups.
The field wiring connections are located behind the top
and hinged panel in the circuit breaker panel. See
Figure 14.
WIRING – LOW VOLTAGE WIRING
230/208V, 1 PHASE AND 3 PHASE EQUIPMENT
DUAL PRIMARY VOLTAGE TRANSFORMERS.
All Equipment leaves the factory wired on 240V tap.
For 208V operation, reconnect form 240V to 208V tap.
The acceptable operating voltage range for the 240 and
208V taps are as noted in Table 3.
OPERATING VOLTAGE RANGE
NOTE: The voltage should be measured at the filed
power connection point in the unit and while
the unit is operating at full load (maximum
amperage operating condition).
The standard Climate Control Option X is a remote
thermostat connection terminal block. See Figure 16 for
wiring diagram. Compatible thermostats are listed in
Table 4.
The Climate Control Option G is an electronic, non-
programmable manual or auto changeover thermostat.
The subbase of the thermostat is factory wired to the
front panel of the unit. The humidistat is included. See
Figure 17 for wiring diagram. Compatible for use with
Bard CS2000 Controller and Energy Recovery
Ventilator.
The Climate Control Option E is an electronic,
programmable thermostat. The subbase of the
thermostat is factory wired to the front panel of the unit.
The humidistat is included. See Figure 18 for wiring
diagram. Compatible for use with Energy Recovery
Ventilator.
NOTE: On option X or G the CS2000 (or other field
LOWER
provided means to control ventilation) must be
CONTROL
PANEL
used if any of the motorized ventilation options
are installed.
TABLE 3
T
A
P
R
A
N
G
2
4
0
V
2
5
3
2
2
0
8
V
2
2
0
1
E
1
6
9
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qa421dQa301dQa361dQa481dQa601d

Table of Contents