GoBeam-8000
Assembly Instruction
Approval Date:
Nimrod Tenne

Revision History

Changes
Release Work Procedure
Fixed
Effective
16.12.2013
Approved by:
Sharon Ashkenazi
Modified By
Oleg Einem
Oleg Einem
Printed version are uncontrolled
DO001152
Revision:
1.1
16.12.2013
Date:
Approved By
Nimrod Tenne
Sharon
Ashkenazi
Page 1 of 16

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GoBeam-8000 and is the answer not in the manual?

Questions and answers

Summary of Contents for Gonet Systems GoBeam-8000

  • Page 1: Revision History

    Proprietary Information - Confidential DO001152 GoBeam-8000 Revision: Assembly Instruction Effective Page: 1 out of 16 Approval Date: 16.12.2013 16.12.2013 Date: Update by: Approved by: Oleg Einem Nimrod Tenne Sharon Ashkenazi Revision History Revision Date Changes Modified By Approved By 09.12.13...
  • Page 2: Table Of Contents

    Proprietary Information - Confidential DO001152 GoBeam-8000 Revision: Assembly Instruction Effective Page: 2 out of 16 Approval Date: 16.12.2013 16.12.2013 Date: Update by: Approved by: Oleg Einem Nimrod Tenne Sharon Ashkenazi Table of Content Revision History ..........................1 Introduction ..........................3 Required Tools ...........................
  • Page 3: Proprietary Information - Confidential Do001152

    Approved by: Oleg Einem Nimrod Tenne Sharon Ashkenazi 1. Introduction This document describes in detail the assembly process of the GoBeam-8000 Top level Systems. 2. Required Tools  Automatic screw drivers with torque (for example “Delvo” DLV-7333 and DLV-7140). ...
  • Page 4: Mechanical Assembly

    Proprietary Information - Confidential DO001152 GoBeam-8000 Revision: Assembly Instruction Effective Page: 4 out of 16 Approval Date: 16.12.2013 16.12.2013 Date: Update by: Approved by: Oleg Einem Nimrod Tenne Sharon Ashkenazi 4. Mechanical Assembly 4.1. Heat Conductive Gap Fillers Gluing 4.1.1. Stick items 2…6 to item 1 after previously cleaning related surfaces of item 1.
  • Page 5: Light Pipes

    Proprietary Information - Confidential DO001152 GoBeam-8000 Revision: Assembly Instruction Effective Page: 5 out of 16 Approval Date: 16.12.2013 16.12.2013 Date: Update by: Approved by: Oleg Einem Nimrod Tenne Sharon Ashkenazi 4.2. Light pipes 4.2.1. Paste the light pipes (item 3) to the item 1 by item 2 without holes between body and light pipes.
  • Page 6: Adhesive Membrane Vent Gluing

    Proprietary Information - Confidential DO001152 GoBeam-8000 Revision: Assembly Instruction Effective Page: 6 out of 16 Approval Date: 16.12.2013 16.12.2013 Date: Update by: Approved by: Oleg Einem Nimrod Tenne Sharon Ashkenazi 4.4. Adhesive Membrane Vent Gluing Stick item 2 to item 1 after previously cleaning related surface of item 1.
  • Page 7: Ps Board

    Proprietary Information - Confidential DO001152 GoBeam-8000 Revision: Assembly Instruction Effective Page: 7 out of 16 Approval Date: 16.12.2013 16.12.2013 Date: Update by: Approved by: Oleg Einem Nimrod Tenne Sharon Ashkenazi 4.5.2. Connect item 2 to item 1 and fasten it by item 3 and item 4 as shown in the image.
  • Page 8: Wireless Mini Pci Boards 2.4Ghz, 5Ghz

    Proprietary Information - Confidential DO001152 GoBeam-8000 Revision: Assembly Instruction Effective Page: 8 out of 16 Approval Date: 16.12.2013 16.12.2013 Date: Update by: Approved by: Oleg Einem Nimrod Tenne Sharon Ashkenazi 4.7. Wireless mini PCI Boards 2.4GHz, 5GHz. 4.7.1. Remove the Product label from mini PCI Boards. (on PS side).
  • Page 9 Proprietary Information - Confidential DO001152 GoBeam-8000 Revision: Assembly Instruction Effective Page: 9 out of 16 Approval Date: 16.12.2013 16.12.2013 Date: Update by: Approved by: Oleg Einem Nimrod Tenne Sharon Ashkenazi 4.7.4. Connect item 3 to item 1 and fasten it by item 2 as shown. (also for Mini PCI 2.4GHz and also for Mini PCI 5GHz)
  • Page 10: Mechanical Assembly

    Proprietary Information - Confidential DO001152 GoBeam-8000 Revision: Assembly Instruction Effective Page: 10 out of 16 Approval Date: 16.12.2013 16.12.2013 Date: Update by: Approved by: Oleg Einem Nimrod Tenne Sharon Ashkenazi 4.8. Mechanical Assembly. 4.8.1. Place item 2 on item 1 and fasten by items 4.
  • Page 11: Beam Forming

    Proprietary Information - Confidential DO001152 GoBeam-8000 Revision: Assembly Instruction Effective Page: 11 out of 16 Approval Date: 16.12.2013 16.12.2013 Date: Update by: Approved by: Oleg Einem Nimrod Tenne Sharon Ashkenazi 4.9. Beam Forming. 4.9.1. Position Beam Forming board on back side of body and connect RF cables of 5GHz as shown in the image.
  • Page 12 Proprietary Information - Confidential DO001152 GoBeam-8000 Revision: Assembly Instruction Effective Page: 12 out of 16 Approval Date: 16.12.2013 16.12.2013 Date: Update by: Approved by: Oleg Einem Nimrod Tenne Sharon Ashkenazi 4.9.4. Position item 2 on item 1 using alignment pins as shown.
  • Page 13: Antennas

    Proprietary Information - Confidential DO001152 GoBeam-8000 Revision: Assembly Instruction Effective Page: 13 out of 16 Approval Date: 16.12.2013 16.12.2013 Date: Update by: Approved by: Oleg Einem Nimrod Tenne Sharon Ashkenazi 4.10. Antennas. 4.10.1. Position item 2 and item 3 on item 1 and tighten items 4.
  • Page 14: Radom

    Proprietary Information - Confidential DO001152 GoBeam-8000 Revision: Assembly Instruction Effective Page: 14 out of 16 Approval Date: 16.12.2013 16.12.2013 Date: Update by: Approved by: Oleg Einem Nimrod Tenne Sharon Ashkenazi 4.11. Radom. 4.11.1. Position Cover (MC000473) on the unit and invert the unit with Cover.
  • Page 15: Sealing Screw

    Proprietary Information - Confidential DO001152 GoBeam-8000 Revision: Assembly Instruction Effective Page: 15 out of 16 Approval Date: 16.12.2013 16.12.2013 Date: Update by: Approved by: Oleg Einem Nimrod Tenne Sharon Ashkenazi 4.12. Sealing screw. After sealing test (if passed) plug up tapped hole in Body by Self Sealing Screw FS000004.
  • Page 16: Plug For Eth2

    Proprietary Information - Confidential DO001152 GoBeam-8000 Revision: Assembly Instruction Effective Page: 16 out of 16 Approval Date: 16.12.2013 16.12.2013 Date: Update by: Approved by: Oleg Einem Nimrod Tenne Sharon Ashkenazi 4.14. Plug for ETH2 and CLI. Manually screw items 2 into item 1 in place of ETH2 and CLI.

Table of Contents