Measuring Station; Operation - Hama EWS-152 Operating Instructions Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
5.1 Base station
• Use the base to position the base station on a level surface.

5.2 Measuring station

• You can also position the measuring station on a level outdoor surface.
• We recommend installing the measuring station securely on an outdoor wall using
the opening (12). Install an anchor, screw, nail, etc. in the wall of your choice.
• Hang up the base/measuring station using the opening intended for this purpose.

6. Operation

Note – Input
Hold down the
6.1 Connection to the measuring station
• After you insert the batteries, the base station automatically searches for a
connection to the measuring station and performs initial setup.
Note
• Initial setup takes approx. 3 minutes.
• Do not press any buttons during setup. Otherwise, values may not be
transmitted correctly and there is a risk of value errors and inaccuracies.
• The setup process is completed when the indoor (3) and outdoor (1)
measurement data is displayed.
• If the base station still does not receive a signal from the measuring station , press
and hold the
the signal.
6
button (7) or the
button (7) for approx. 3 seconds to start the manual search for
button (9) to select values faster.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents