Preconditions; Flue; Combustion Air; Standard Delivery - KEDDY SK1000 Installation Instructions Manual

Hide thumbs Also See for SK1000:
Table of Contents

Advertisement

PRECONDITIONS

BUILDING NOTICE
Committee in your municipality for up-to-date infor-
mation.

FLUE

inserts are also approved for connection to older
be connected to chimneys made of prefabricated ele-
should be at least 3.5 m tall and have an area of ap-
prox. 120 cm2.
COMBUSTION AIR SUPPLY
the house atmosphere.
A sheet metal drum can be used to extend an out-
door air duct. The connection diameter of the supply
air hose to the stove is 63 mm. If the duct is more
must be increased to 100 mm. The drum can be con-

STANDARD DELIVERY

Check that all parts for your installation are included
in the delivery.
Insert
1 x Heat resistant sealant
1 x Glove
ACCESSORIES
-
Stand
-
-
-
- 4 -
-

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sk2000

Table of Contents