S
MT/2A - 03.2A UNDERGROUND MOTOR FOR WING GATES UP TO 3,00 m AND 250 Kg
EACH WING - 230Vac
CF/2A - 03.CF
FOUNDATION BOX
Thank you for choosing a SERAI ELETTRONICA product, which we are confident will perform to your requirements.
Please be advised that you are about to fit a system classified as "a power-operated drive designed to move automatic ga-
tes and doors in commercial or residential buildings accessed by vehicles and persons", and as such, the system must be
considered potentially hazardous. By law, you are responsible for rendering this equipment as "safe" as is reasonably pos-
sible.
Installation and maintenance of equipment of this kind must therefore be carried out by skilled, qualified and trained
personnel, working in a professional manner, as provided for by law n. 46/90 and any subsequent amendments and
supplements. The law in question prohibits the construction of these types of systems by non-qualified personnel.
SERAI manufacturing complies with the following legislation:
Applicable directives for the CE marking :
Machines:
Low Voltage:
Electromagnetic Compatibility:
General applicable standards:
Electrical Safety:
Electromagnetic Compatibility - Emissions:
Electromagnetic Compatibility - Immunity:
Apart from the legislation mentioned above, you are also reminded to comply with the following standards during the
installation phase.
General applicable standards:
Safety of electrical systems in non-specialised environments:
Specific product standards applicable:
Safety in the use of power-operated doors - requirements:
Safety in the use of power-operated doors - testing methods:
SERAI products enable users to build systems which comply with these standards. This is extremely important as
!
THE INSTALLER IS LIABLE FOR THE SYSTEM AND FOR ENSURING ITS OPERATION COMPLIES WITH
LEGAL PROVISIONS.
This handbook must be read in full before proceeding with the installation of the various parts of the system.
The installation of the mechanical end stops for gate opening and closure is necessary for system safety purposes
and therefore this operation must be performed before proceeding with the installation of the control unit.
E
R
GATE AUTOMATION DIVISION
INSTALLATION MANUAL
98/37/EEC
73/23/EEC
89/336/EEC
IEC EN60335-1 + IEC EN60335-2-103
CEI EN61000-6-3
CEI EN61000-6-
CEI 64-8
UNI EN12453
UNI EN12445
A
I
Pag. 1/5
Need help?
Do you have a question about the MT/2A and is the answer not in the manual?
Questions and answers