Ch. 1 GENERAL INFORMATION
Attention on Operation
Certified lubricants in cans shall be used on all the elements to be lubricated.
After assembly, performance of all elements shall be duly checked and the locking shall
be duly verified.
In case of an operation is performed by over 2 people, the assignment shall be
conducted in coordination and safety shall be the first priority.
Remove residues of the old gasket or sealant before reinstallation, grind with a
grindstone if the contact surface has any damage.
The ends of rubber hoses (for fuel, vacuum, or coolant) should be pushed as far as they
can go to their connections so that there is enough room below the enlarged ends for
tightening the clamps.
1-5