Getting Started - IBM FlashSystem 710 User Manual

Hide thumbs Also See for FlashSystem 710:
Table of Contents

Advertisement

DANGER
When working on or around the system, observe the following precautions:
Electrical voltage and current from power, telephone, and communication cables are hazardous. To
avoid a shock hazard:
v Connect power to this unit only with the IBM provided power cord. Do not use the IBM
provided power cord for any other product.
v Do not open or service any power supply assembly.
v Do not connect or disconnect any cables or perform installation, maintenance, or reconfiguration
of this product during an electrical storm.
v The product might be equipped with multiple power cords. To remove all hazardous voltages,
disconnect all power cords.
v Connect all power cords to a properly wired and grounded electrical outlet. Ensure that the outlet
supplies proper voltage and phase rotation according to the system rating plate.
v Connect any equipment that will be attached to this product to properly wired outlets.
v When possible, use one hand only to connect or disconnect signal cables.
v Never turn on any equipment when there is evidence of fire, water, or structural damage.
v Disconnect the attached power cords, telecommunications systems, networks, and modems before
you open the device covers, unless instructed otherwise in the installation and configuration
procedures.
v Connect and disconnect cables as described in the following procedures when installing, moving,
or opening covers on this product or attached devices.
To Disconnect:
1. Turn off everything (unless instructed otherwise).
2. Remove the power cords from the outlets.
3. Remove the signal cables from the connectors.
4. Remove all cables from the devices.
To Connect:
1. Turn off everything (unless instructed otherwise).
2. Attach all cables to the devices.
3. Attach the signal cables to the connectors.
4. Attach the power cords to the outlets.
5. Turn on the devices.
(D005)

Getting started

There are several tasks that you can perform to set up your initial configuration.
To initially configure your new storage system, complete the following tasks:
v Use the front panel display to set up the network (see **** MISSING FILE ****).
v Set up the web management interface (see "Web interface basics" on page 12).
v Use the web interface to set the date and time (see Setting the date and time by using the web
interface).
v Use the web interface to configure advanced network settings (see **** MISSING FILE ****.
v Use the web interface to configure security (see "Managing security with the web interface" on page
13).
System initialization
When ac power is connected, the storage system powers-up and the front panel display shows the
power-on sequence.
IBM FlashSystem 710 User's Guide
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents