Page 3
LZO8TL*1C, LZO8TL*2C, LZO8TL*3C HANGER BRACKETS & TRAP INSTALLATION 1) Remove hanger bracket fastened to back of cooler by removing one (1) screw. 2 ) Mount the hanger bracket as shown in Figure 2. NOTE: Hanger Bracket MUST be supported securely. Add fixture support carrier if wall will not provide adequate support. Anchor hanger securely to wall using all six (6) 1/4 in.
Page 4
LZO8TL*1C, LZO8TL*2C, LZO8TL*3C Service Instructions Bubbler Lower and Upper Shroud Assembly To access the refrigeration system and plumbing connections, remove four screws from bottom of cooler to remove the lower shroud. To remove the upper shroud for access to the pushbars, regulator, solenoid valve or other components located in the top of the unit, remove lower shroud, disconnect drain, remove four screws from tabs along lower edge of upper shroud, unplug two wires and water tube.
Page 5
LZO8TL*1C, LZO8TL*2C, LZO8TL*3C WIRING DIAGRAM - EZO 230V BLACK LED PCB WHITE 230V PARTS LIST GREEN YELLOW ITEM NO. PART NO. DESCRIPTION SENSOR PURPLE PURPLE JUMPER TO DUMMY UNIT 36066C Power Cord OVERLOAD SOLENOID 31431C Fan Motor VALVE GREEN 33133000 Adapt - Tab .250 36092C Compressor Serv.
Page 6
PARA PIEZAS, CONTACTE A SU DISTRIBUIDOR LOCAL O LLAME AL 1.800.323.0620 IMPRIMÉ AUX É.-U. POUR OBTENIR DES PIÈCES, CONTACTEZ VOTRE DISTRIBUTEUR LOCAL OU COMPOSEZ LE 1.800.323.0620 ELKAY MANUFACTURING COMPANY • 2222 CAMDEN COURT • OAK BROOK, IL 60523 • 630.574.8484 98399C (Rev. C - 03/09) Page 6...
Need help?
Do you have a question about the LZO8TLx1C and is the answer not in the manual?
Questions and answers