Primus Wind Power EZ Tower Owner's Manual page 17

For air wind turbines
Table of Contents

Advertisement

2. With the tubes laid out as shown on the preceding page, slide the guy
wire attachment plates over the corresponding tower tubes.
• Slide the 30 ft (9.1 m) guy wire attachment plate over the top tower tube.
• Slide the 21 ft (6.4 m) guy wire attachment plate over the fourth tower
tube from the bottom.
3. Align the guy wire attachment plate so that each guy wire is in line with
the anchors.
4. With all guide wire attachment plates in position, electrical wire can be
run through the tower tubes. Leave sufficient wire protruding at the top of
the tower to connect the wind turbine.
• Electrical wire can also be pulled through with a wire snake, after the
tower tubes are assembled.
• Refer to AIR Wind turbine Operator's Manual (AAS32 - Document
#0056) for proper wire gauge selection.
5. Join the tower tubes together using a soft-faced mallet or hammer. Use
a piece of wood between the tube and the mallet to protect the end of the
tube.
• The expanded end of the tube prevents the guy wire attachment plate
from sliding down the tube, and positions the guy wire attachment plate at
the correct height.
6. Secure the lower tube to the tower base with the M10 bolt and nyloc
nut. Tighten the nut until it just contacts the tower base.
EZ Tower
Owner's Manual, Rev A 17
TM

Advertisement

Table of Contents
loading

Table of Contents