SITE PREPARATION

PLUMBING
• See faucet manufacturer' s specifications for zoning
and plan water supply location accordingly.
• Position drain according to bath' s technical specifications.
WARNING
• Baths from Nokori
collection cannot be drilled
®
for faucet installation. Faucets must be freestanding
or wall-mounted models.
BEDDING
• Before installing, ensure that the floor underneath the bath can support 1500 lb (680 kg). The bath may sit directly
on the floor.
SERVICE ACCESS AND VENTILATION
• A service access is necessary. Minimum dimensions are 22 in. x 18 in. (55 cm x 46 cm)
to properly reach all electrical components of the system.
• An air vent is necessary. Minimum dimensions are: 2 in. x 4 in. (5 cm x 10 cm)
to ensure proper functioning of the turbine.
There is a technical specification sheet for each BainUltra
dimensions of site before installation.
If you do not already have the technical specifications, download from the BainUltra
or call us at: 1 800 463-2187.
www.bainultra.com
Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.
FLOOR
ThermoMasseur
which includes information such as necessary
®
®
®
1500 LB
(680 KG)
Web site at: bainultra.com