Items Needed Before Starting - Neurio Installation Manual

Table of Contents

Advertisement

Intro
To watch a video of the installation visit support.neur.io
This booklet will guide an electrician or a professional
installer through the typical installation process of
the Neurio Sensor on a two-phase system (the most
common power system in North America). If you have
a one-phase, three-phase or solar system, please visit
support.neur.io for instructions.
I T EM S N E ED E D BEFO R E START ING:
+ Smartphone with the Neurio app installed
+ Flashlight — after all your power will be turned off
+ Thick rubber gloves (for working near live wires)
+ #2 Phillips and flathead screwdrivers
+ One (1) empty 15 or 20 amp dual (double)
pole breaker*
+ 4" length of 12 or 14 gauge wire
+ Contents of Neurio box
*N OTE :
The voltage cables on the Neurio Sensor need to be
installed on two empty breakers (one for each phase) or one empty
dual (double) pole breaker. However, some regional codes allow
you to piggyback wires on existing breakers by using the supplied
wiretaps and attaching the voltage wires from Neurio to the existing
cables before they go into a breaker. See Step 4 for diagrams. Please
consult your local electrical code for approved methods.
GlobalTestSupply
Find Quality Products Online at:
www.
This product must be installed by an
CAUTION:
electrician or other qualified professional. Before
following this guide, please read and review the
safety warnings provided at the end of this book.
.com
sales@GlobalTestSupply.com

Advertisement

Table of Contents
loading

Related Products for Neurio neurio

Table of Contents