19 | © 2017 ABB | 1SDH000999R0002 - ECN000058721 - Rev. B
Continued from the previous page
5.
Turn the crank clockwise until the pushbutton comes out and the indicator shows that the circuit-
breaker is in TEST position. See Figure 34.
Figure 34
6.
Press the lock button and then rotate the crank clockwise until the button comes out and the indicator
shows that the circuit-breaker is in the CONNECT position. See Figure 35.
Figure 35
7.
Extract the crank. See Figure 36.
8.
Replace the crank in its housing See Figure 37.
Figure 36
2
Figure 37
ABB | SACE Emax 2
1
Continued on the next page
Emax E1.2 circuit-breakers | 4 - Description