Dometic RM2410 Installation And Operating Instructions Manual page 5

Absorption refrigerators
Table of Contents

Advertisement

FIG. 6
MODELS
RM2410
RM2510
12 VOLT D
TERMINAL
BLOCK FOR
REIGNITOR
When testing the gas supply system at test pressures in
excess of 1/2 psig the refrigerator and its individual
shutoff valve must be disconnected from the gas supply
piping system.
When testing the gas supply system at pressures less
than or equal to 1/2 psig the appliance must be isolated
from the gas supply piping by closing its individual
manual shutoff valve.
In case detailed instructions on the installation and
connection to the gas supply are required, contact your
dealer or distributor.
9. GAS SAFETY SHUTOFF
The gas safety shutoff must be tested after the
refrigerator is connected to the LP Gas supply.
To test the gas safety shutoff, proceed as follows:
n Refrigerator with Piezo lgnitor
(RM2410)
A.
Start the refrigerator according to the instructions
for gas operation with piezo ignitor. See Section. B.
Operating Instructions, Item
BLOCK FOR
HEATING
ELEMENT
Gas Operation.
3.
TERMINAL -
BLOCK FOR
REIGNITOR
Check that the gas flame is lit. This can be
B.
observed through reflector
C.
Close the gas valve by turning the knob 'A' back to
'OFF' position. (See FIG.
FIG.
7
REFRIGERATORS WITH PIEZO
IGNlTORS (MODEL RM2410)
D.
Wait one (1) minute.
E.
Remove burner cover plate. (See FIG. 6A). Open the
gas valve by turning knob 'A' to position 'GAS'
without pushing the buttons 'C' and 'D'. (See FIG.
7). Apply commercial leak check bubble solution to
the burner jet. (See FIG. 8, Page 5). Be careful not
to damage the burner jet.
4
FIG. 6A
MODELS
RM2610
RM2810
BURNER
COVER
PLATE
' E ' . (See FIG. 7).
7).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rm2610Rm2810Rm2510

Table of Contents