Carrier 38GXM series Installation Instructions Manual page 10

Multi-split high-wall duct free split system
Hide thumbs Also See for 38GXM series:
Table of Contents

Advertisement

START-UP
Test Operation
Perform
test operation
after completing
gas
leak and
electrical
safety check.
1, Push
the "ON/OFF"
button
on Remote
Control
to begin
testing.
NOTE:
A protection
feature
prevents
the air conditioner
from
being activated
for approximately
3 nfinutes.
2, Push
MODE
button,
select
COOLING,
HEATING,
FAN
mode to check if all functions
work correctly,
SYSTEM
CHECKS
1. Conceal
the tubing where possible.
2. Make sure that the drain tube slopes downward
along its en-
tire length.
3. Ensure
all tubing
and connections
are properly
insulated.
4. Fasten tubes to the outside
wall, when possible.
5. Seal the hole through
which the cables
and tubing pass.
INDOOR
UNIT
1. Do all Remote
Control
buttons
flmction
properly?
2. Do the display
panel lights work properly?
3. Does the air deflection
louver function
properly?
4. Does the drain work?
OUTDOOR
UNIT
1. Are there unusual
noises or vibrations
during
operation?
Explain
Following
Items
To Customer
With
The Aid
Of The
Owner's
Manual:
1, How
to
turn
air
conditioner
on
and
off;
selecting
COOLING,
HEATING
and other
operating
modes;
setting
a desired temperature;
setting the timer to automatically
start
and stop air conditioner
operation;
and all other features
of
the Remote
Control
and display
panel.
2. How to remove
and clean the air filter.
3, How to set air deflection
louver.
4, Explain
care and maintenance.
5, Present
the Owner's
Manual
and installation
instructions
to
customer.
10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

40gxm series

Table of Contents