Fisher & Paykel DE4024P Installation Instructions & User Manual page 18

Table of Contents

Advertisement

Available languages

Available languages

Final setup
Level the dryer
1
Stand the dryer upright near the final location
and adjust the four leveling legs at the corners to
ensure that the dryer is level from side to side and
front to rear.
Plug dryer in
2
Note: stacking installations may require a power
cord up to 6 feet (1.8m) in length.
Dryer startup
3
Press the 'POWER' button.
Note: if the dryer has been exposed to temperatures
below freezing for an extended period of time, allow
it to warm up before pressing 'POWER'. Otherwise,
the display will not come on.
The dryer is now ready for use.
16
INSTALLATION INSTRUCTIONS
49-90571
Levelling the feet
Ensure proper
ground exists
before use.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents