Check-Out Procedures And Adjustments; Verify Proper Sequence Of Operation - Kenmore K90-50 Installation Instructions Manual

K90 series
Table of Contents

Advertisement

I
I
FIGURE 16
INDICATOR
LAMPS
A. VERIFY
PROPER
SEQUENCE
OF OPERATION.
The sequence can be followed via the diagnostic
indicator lamps on the UT 1013-10 integrated
boiler control in Fig.16.
This is the normal sequence of operation.
A more detailed sequence of
operation containing
potential
faults can be found in the service hints section.
DIAGNOSTIC
SEQUENCE
OF OPERATION
INDICATOR
LAMPS
Power
ON,
boiler
standing
by.
Lamp
A is illuminated
indicating
24 volt power
is
A. •
being
supplied
to the integrated
boiler
control.
B. O
C.
O
D. O
E.
O
Thermostat
calls
for heat,
energizing
system
circulator.
A. •
B.
0
C.
0
D. 0
E.
0
Integrated
boiler
control
goes through
self check
of internal
circuitry
(1-2 seconds)
A. •
and energizes
draft
inducer.
B.
O
C.
O
D. O
E.
O
Draft
inducer
comes
up to speed
and establishes
combustion
airflow,
causing
the
A. •
normally
open
differential
pressure
air proving
switch
contacts
to close.
Lamp
B is
B.
C.
O
illuminated
indicating
that combustion
airflow
is proved
and the 15 second
pre purge
D. O
cycle
is under
way.
E.
O
After
pre purge,
Lamp
B goes out and Lamp
C illuminates,
indicating
the hot
A. •
surface
igniter
is powered
for the 20 second
igniter
warm-up
period.
The bright
B. O
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

K90-100K90-75

Table of Contents