Placing Boiler In Operation; For Your Safety Read Before Operating; Operating Instructions - Kenmore K90-50 Installation Instructions Manual

K90 series
Table of Contents

Advertisement

6.
Inspect piping system.
Repair any leaks immediately.
NOTE:
DO NOT use stop leak compounds.
Leaks in threaded
connections
in the aluminum boiler
sections must be re_)aired immediately.
Aluminum
threads will not seal themselves.
D. PLACING
BOILER
IN OPERATION
_FOR
YOUR
SAFETY
READ
BEFORE
OPERATING
WAFINING:
If yotJ do
not
follow
thles_
instructions
exactly,
a fire
or
explo_io=]
may
result
_au_ing
propuHy
dama_lo,
personal
iniury
or Io_.s
of life.
A.
This
appliance
does
not have
a pilot.
It is equipped
with
an
ignition
device
which
automatically
iight6
lh_ hllr_r
r)o nnt Iry to li0ht Ih_ hHrn_r
hy h_nd
B.
BEFORE
OPERATING
8raetll
all
=round
tile
_ppliance
argo
for
gar,.
Be
_'ure
to
_moll
next
to
the
floor
b_oau_t_
some
gas
is he=trier
than
air
and
will
seltie
on
the
floor.
WHAT
TO
DO
IF YOU
SMELL
GAS
" Do not try to light
any
appliance.
• Do _of
tou_h
any
_t_etrlc
_witch:
do not
u_e
tony
phone
m your buildirlg.
hm_ledi_lely
u_ll yuu_ gut= _uppliur
Iivm
,t
neighbor'c
phone.
Follow
the
gos nuaplier'o
If yOU cannel
reach
your
gait; supplier,
_atl the= fife
nl_ p_rlmp.m
C.
Use
only
your
h=tnd
to turn
the gas
control
knob.
Never
u_g
too|_.
If the
knob
will
not
turn
by hand,
don't
try to' r_pait
it. call a qualified
service
teollnician.
Force
or attempted
repair
may
result
In a fire o_
e_plosion,
O.
Do
not
use
this
appliance
if any
p_trf
h_L¢ b_
IlndRr
waler.
Immediately
call
a qualified
service
technician
to i_,,_p_l
th_
apphancJe
_=l_t to
replace
any
parl
el the
0onfrol
,_.y.'_tom
and
_y
ga_
_ontrol
which
b0,_
beer1
iJtltlf_
f WRIRr
_n_lructions
OPERATING
INSTRUCTIONS
1,
STOP!
Rood
the
_afoty
information
above
on
thi¢
label
_-
Set lhe Shortage, tat to the
!owe=l
setting.
3.
Turn
_ff all glectric
power
to lhg appliance.
4.
This
appliance
is equipped
with an ignition
device
which
automatR:_llly
lights
thg burner
Do _
try
to light the _urnar
bY han_.
OAO CONT/IO_
_NOD J
_H_'N
IN "IJN" HL_;',;',;',;',;',;
_I II_)N
5. Remove
the front _acket
pane[
6. Turn
the gas control
knob clockwise
F'_
to "OFF •.
7. Wait
five (5) minutes
10 clear
out any gas.
I hen smell
for
gas.
tnclu0tng
near
the
floor,
If you
5m_'ll
g_;,
_;TOP{
Follow
"B" in the _afety
information
_bove
on
thi_ lab_i.
If you
doWt sm#ll
gag, go to next
step
_. Turn the g_
_ontrol
knob oounterclockwL_o
_
to "ON •.
9. Rel:)laP..e the front
locket
panel.
t0
Turn
on all electric:
power
to the appli_n,:_
1 1 Get II_errnostat
to deaired
setting
12
I1 the aPr_liance
will riot operate,
follow the instrucbons
"To Turn
Off Gas
To Agglia_cu"
anLl _11 yuur n_vfc_
tochnioie.n
or g[l_
oupplio_
_TO
TURN
OFF
GAS
TO
APPLIANCE_
1.
Set
the
thermostat
to
the
lowest
_etting
Turn
off
all
_l_%tric
10owol
to
the
applidh_;'b
if
_.elviGe
i€ tO be
prsrlorrnr_d,
4.
Turn
g._,_= ;onlrol
knob
clockwise
_
to "OFF'.
Do not for_o
_epl_n÷
th_ frnnt
j_Pk_t
p_n_=l
3
Ramnve
the tronl jacket
_nel
Q90
Boiler
Safe lighting and other performance
criteria
were met with the gas manifold
and control assembly
provided
on the boiler when the boiler underwent
tests specified
in ANSI Z21.13-latest
revision.
36

Advertisement

Table of Contents
loading

This manual is also suitable for:

K90-100K90-75

Table of Contents