Condensate Drain Piping - Kenmore K90-50 Installation Instructions Manual

K90 series
Table of Contents

Advertisement

OPEN
DRAIN
PIPE TO
BE PITCHED
DOWN
TO
FLOOR
DRAIN
AT A MINIMUM
I/4" PER
FOOT
TO
DRAIN
THREADED
NIPPLE
(INSTALLED)
CONDENSATE
DRAIN
PVC
TEE
I/2"SMPxl/2"SMPxl/2
"NPT
FURNISHED
IN PARTSBAG
FIGURE
8
CONDENSATE
- DRAIN PIPING
D. CONDENSATE
DRAIN PIPING
The condensate
trap is built into the boiler, an external trap is not required
and should NOT be
used.
Provide
'/2"PVC condensate
drain and fittings. Condensate
drain to be pitched down to floor drain
at a minimum
of ¼"per
foot.
Install furnished
I/z"PVC tee to overflow
fitting
as shown in Fig.8.
The 1/2"diameter schedule 40 PVC or CPVC condensate
drain piping and pipe fittings must
conform
to ANSI standards
and ASTM D1785 or D2846. Schedule 40 PVC or CPVC cement and
primer must conform to ASTM D2564 or F493. In Canada,
use CSA or ULC certified
schedule 40
PVC or CPVC drain pipe and cement.
A condensate
pump with a reservoir
(not furnished)
may be used to remove condensate
to a drain
line (sanitary
line) above boiler if a floor drain is not available
or is inaccessible.