6325 Edge Node Legal Notices Legal Notices This Tellabs manual is owned by Tellabs or its licensors and protected by U.S. Copyright Statement and international copyright laws, conventions, and treaties. Your right to use this manual is subject to limitations and restrictions imposed by applicable li- censes and copyright laws.
Label equipment must be collected separately. In case of very small products, the figure may only be on the packaging or in this manual. The Tellabs name and the production date will also be labelled on the product. For further information about separation and handling the disposed equip- Further information ment to ensure correct reuse or recycling, please look at www.tellabs.com.
® Tellabs 6325 Edge Node Revision Information Revision Information This manual has changed as follows: Revision history Rev. Date Description of Changes Feb. 22, 2006 First version of the manual. June 14, 2006 Compared to revision A1: • Minor changes have been performed.
® Tellabs 6325 Edge Node Warnings and Precautions Warnings and Precautions It is important that you read these safety information before you begin to in- Overview stall or performing service on the equipment. Chose one of the following: • ‘Warnings and Precautions’ on page 5 (this section) •...
Page 6
® Tellabs 6325 Edge Node Warnings and Precautions Use an antistatic bracelet connected to the subrack while installing or servic- ESD precaution ing the system. Do this to avoid damaging components sensitive to static elec- tricity. Connect the antistatic bracelet to the subrack as shown in the figure be- low.
® Tellabs 6325 Edge Node Sicherheit Informationen Sicherheit Informationen Die folgenden Sicherheit Informationen bitte berücksichtigen: Überblick • ‘Warnungen und Vorkehrungen’ on page 7 • ‘Spezifikationen’ on page 10 Warnungen und Vorkehrungen Berücksichtigen Sie die Warnungen, die hier beschrieben werden, wenn Sie Laserstrahlung Installierung oder Wartung an der Ausrüstung durchführen.
Page 8
Warnung wenn Sie den. Auf Seite bitte sehen, wie man das Baugruppenträger anbringt. Baugruppenträger in ein (‘To install the subrack for the Tellabs 6325 node’ on page 24). Gestell anbringen Sicherstellen, die PS-DC Einschübe mit den Schrauben zu befestigen, wie im Warnung wenn Sie PS- folgenden Verfahren beschrieben, wenn Sie PS-DC Einschübe in das Baugrup-...
Page 9
Es ist lebenswichtig, daß das Tellabs 6325 node richtig geerdet wird. Wenn es Externe Erdleitung zum in ein Gestell angebracht wird, wird das Tellabs 6325 node an das Gestell Be- Tellabs 6325 node zugspotential durch die Haltewinkel (Masse, Erdungspotential) und der Er- dung Stift (Stift 2) des Spg.Versorgungsteilsteckers gebunden.
Schraube M4x8 und die Unterlegscheibe benutzen (geliefert mit dem Baugruppenträger) um die Leitung anzubringen. Spezifikationen Das Tellabs 6325 node ist entworfen, um in einem typischen kommerziellen Plazierung Richtlinien Klima zu funktionieren. Die folgenden Richtlinien bitte beobachten: • Im Falle des Wechselstroms einen geerdeten, dreizackigen Energie An- schluß...
‘References’ on page 15 Purpose of the Manual The purpose of this manual is to: Purpose • Inform the user how to install and connect the Tellabs 6325 node. • Provide reference information. Structure of the Manual The manual is structured as follows: Manual structure •...
® Tellabs 6325 Edge Node Preface International Electrotechnical Commission Input/Output ITU-T ITU - Telecommunication Standardisation Sector International Telecommunication Union Light Emitting Diode Mbit/s Megabit per second MTBF Mean Time Between Failures Multi Longitudinal Mode Laser Not Applicable Network Element nanometer, (1*E-9 meter)
This overview gives a short introduction of the Tellabs 6325 node. In this overview The Tellabs 6325 node is part of the Tellabs product range for access and re- Product relationship gional telecommunication transmission networks based on the standards and recommendations on SDH from ETSI and ITU.
The rack ID and subrack ID are software settings. If you have Note: defined a rack ID and a subrack ID for the Tellabs 6325 node then these have to be entered when you configure the Tellabs 6325 node using the craft terminal or network manager.
® Tellabs 6325 Edge Node 2 Installation Information Exposure to laser radiation risked during service or installation can be hazard- IEC825 classification ous in case of double fault conditions. limits of optical power radiated from single mode fiber end Classification...
Labels on modules low. Physical Placement The Tellabs 6325 node is designed to operate in a typical commercial environ- Placement rules ment. Please observe the following rules: • In case of AC powering, use a grounded, three-pronged power outlet ap- proved by the electrical code of the region.
The adaptation bracket NS-0296 is used for 19 inch racks and NS- 0297 is used for ETSI racks. Insert the nuts including clips in the holes corresponding to the de- sired rack position of the Tellabs 6325 node. MA365 • Rev. A2...
Follow this procedure to install the support modules required in any configu- To install the support ration. modules If you are going to remove a module from a working Tellabs 6325 Warning: node then remember to follow the instructions in ‘2.8 Removing a Module from the Subrack’...
Page 26
(two on each module). Follow this procedure to install the traffic modules. To install the traffic modules If you are going to remove a module from a working Tellabs 6325 Warning: node then remember to follow the instructions in ‘2.8 Removing a Module from the Subrack’...
® Tellabs 6325 Edge Node 2 Installation Information Installing the Transceivers Follow the instructions. To insert and remove the transceivers Step Action Insert the transceivers into the cages. Push the transceiver lightly until it is locked. If you need to remove the transceiver, turn the clip, that locks the transceiver, to the horizontal position.
The following procedure describes how to connect the transport and manage- To connect the transport ment cables to the Tellabs 6325 node. Some steps might not be relevant for and management cables your specific configuration. In these situations you just go to the next step.
Page 29
® Tellabs 6325 Edge Node 2 Installation Information Step Action Connect the optical cables for the optical STM-1, STM-4 and STM-16 interfaces on the SIMX4, SIMX16 and SPIX modules. Please observe the minimum bending radius of the optical fiber Note: (35 mm), to avoid damage to the fibers.
Page 30
Connect the cable for the synchronization and alarm interface (SYNC/ALARM). The coding of the open ended 120 ohm cable is shown in ‘Color coding of open ended cables’ on page Connect the Ethernet cable (MGT) for management of the Tellabs 6325 node. MA365 • Rev. A2...
Page 31
Action Connect a PC running the Craft Terminal program to the CT connec- tor for local management of the Tellabs 6325 node. Connect user channel and EOW cable to the UCH connector. If your configuration requires 75 ohm interfaces on the PIM1 module it can be To provide 75 ohm PIM1 provided by using external baluns.
Page 32
® Tellabs 6325 Edge Node 2 Installation Information Step Action Arrange the wires of the open ended PIM1 cable (WK-503Y-zz.z-01). The figure shows the cable arranged with the seven binders each holding six twisted pairs. Connect the wires to the baluns according to the table shown in ‘Pin...
Page 33
Tellabs 6325 Edge Node 2 Installation Information The Tellabs 6325 node cabinet must always be tied to a suitable earth reference Ground to 48 VDC potential as described below. The DC power interface of the Tellabs 6325 node is galvanically insulated from the cabinet. The positive pole of the DC supply (0 VDC) is default connected, by a solder strap on the PS-DC module, to the ground connector of the power supply plug as shown in the figure.
Page 34
It is vital that the Tellabs 6325 node is properly earthed/grounded. When in- External ground to the stalled in a rack, the Tellabs 6325 node cabinet will be tied to the rack reference Tellabs 6325 node potential through the mounting brackets (earth, ground potential) and the ground pin (pin 2) of the power supply plug as shown in the figure.
Page 35
(PDP) Disconnect power by either switching off or removing the fuses from the PDP. There is no built-in power switch on the Tellabs 6325 node. Note: Connect the power supply cable (with ground) to the DC input plug (3 pole Molex mini-fit).
Page 36
The following procedure describes how to connect the external AC/DC pow- To connect the external er adapter to the PS-DC module. AC/DC power adapter The Tellabs 6325 node must be earthed as described in this proce- Warning: dure when using the external AC/DC power adapter. Step...
This procedure has to be followed removing all types of modules. from the subrack The Tellabs 6325 node will be reset if this procedure is not followed. Warning: To avoid damage on components sensitive to static electricity, use an Note: antistatic bracelet connected to the chassis of the Tellabs 6325 node.
Page 38
Please follow this procedure when you have to remove a fan module from the To remove the fan subrack. module from the subrack The Tellabs 6325 node will be reset if this procedure is not followed. Warning: To avoid damage on components sensitive to static electricity, use an Note: antistatic bracelet connected to the chassis of the Tellabs 6325 node.
6325 Edge Node 3 Reference Information Reference Information The reference information includes information about item numbers, func- Overview tional description and specifications of the Tellabs 6325 node. • ‘3.1 Front Layout’ on page 39 • ‘3.2 Logistics’ on page 41 •...
Page 40
® Tellabs 6325 Edge Node 3 Reference Information The figure shows the front of the SPIMX module. SPIMX module The figure shows the front of the PIM1 module. PIM1 module The figure shows the front of the CMCC module. CMCC module The figure shows the front of the PS-DC module.
The figure shows the front of the fan module with the synchronization and Fan module alarm connector. Logistics The following subrack items are available for the Tellabs 6325 node. Subrack items Description Item number SC2 subrack. The following items are delivered...
Page 42
AC/DC adapter CM3569 Fan module CM3565 The following transceivers are available for the SIMX and SPIMX modules in Transceivers for SIMX the Tellabs 6325 node. and SPIMX modules Description Item number Transceiver, S-1.1 (SFP with LC connectors) TR-0001 Transceiver, L-1.1 (SFP with LC connectors) TR-0002 Transceiver, L-1.2 (SFP with LC connectors)
Page 43
® Tellabs 6325 Edge Node 3 Reference Information The following balun items are available for the Tellabs 6325 node. Balun items Description Item number RJ-45 to 1.0/2.3 (female) cable with 120/75 ohm WK-508B-01.0-01 balun inside for 2 Mbit/s interface on SPIMX module.
Page 44
Description Item number 9 pole D-sub to open ended, 120 ohm, 3 m WK-502X-03.0-01 The following management cables are available for the Tellabs 6325 node. Management cables Description Item number Craft terminal interface cable, RJ-45 to RJ-45, 3 m WK-480X-03.0-01...
® Tellabs 6325 Edge Node 3 Reference Information The following embedded software is available for the Tellabs 6325 node. Embedded software Description Item number 6325 ESW, FP1.0, CD-ROM SW6325-0010M200 LEDs, Switch and Connectors The figure below shows the location of the LEDs and switch on the front of the LEDs and switch on CMCC module.
Page 46
® Tellabs 6325 Edge Node 3 Reference Information The figure below shows the location of the LED on the front of the PS-DC LED on PS-DC module module. The functions of the LED are described in the table below. Indication...
Page 47
® Tellabs 6325 Edge Node 3 Reference Information The functions of the connectors are described in the table below. See the mod- Connectors on modules ules in ‘3.1 Front Layout’ on page Connector Description on module STM-16 STM-16 optical interface with SFP transceiver...
6325 Edge Node 3 Reference Information Functional Description The Tellabs 6325 node is housed in a 1 U high subrack. The supplied flanges Housing can be mounted to adapt to either 19 inch or ETSI wide racks. All connections are made directly to the connectors at the front of the modules Connections of the Tellabs 6325 node.
Page 49
• Embedded Communications Channel (ECC) of STM-1/4/16 line. The ECC may be transferred in DCCR or DCCM bytes of the STM-1/4/16 line overhead or in selectable VC-12. The Tellabs 6325 node can be managed by the Tellabs 6300 manager and the Management software Tellabs 8000 manager.
Page 50
DC-C (0 V connected to ground) or DC-I (0 V separated from ground) ground- ing of the Tellabs 6325 node. Default is DC-C shown on the figure. The Tellabs 6325 node may be powered from an AC input or DC input. The Power supply...
® Tellabs 6325 Edge Node 3 Reference Information Specifications The specifications for the Tellabs 6325 node are described in: Overview • ‘3.5.1 SDH Optical Interfaces’ on page 51 • ‘3.5.2 PDH Electrical Interfaces’ on page 55 • ‘3.5.3 Synchronization Interface’ on page 56 •...
Page 52
® Tellabs 6325 Edge Node 3 Reference Information Parameter Value Unit L-16.2 Class S-16.1 L-16.1 L-16.2 CWDM C-Band Mean launched power range -5 to 0 -2 to +3 -2 to +3 0 to +5 0 to +5 Min. extinction ratio Pulse Mask According to Fig.2/ G.957...
Page 53
® Tellabs 6325 Edge Node 3 Reference Information Parameter Value Unit L-4.2 Class S-4.1 L-4.1 L-4.2 C-Band Wavelength range 1274-1356 1280-1335 1480-1580 1530-1565 - max. RMS width - max. -20 dB width - min. SMSR Mean launched power range -15 to -8...
Page 54
® Tellabs 6325 Edge Node 3 Reference Information Parameter Value Unit Class S-1.1 L-1.1 L-1.2 Nominal Bit Rate 155520 kbit/s Transmitter at reference point S Source Type Wavelength range 1261-1360 1263-1360 1480-1580 - max. RMS width - max. -20 dB width - min.
® Tellabs 6325 Edge Node 3 Reference Information 3.5.2 PDH Electrical Interfaces The following table shows the specifications for the electrical input ports at 2 Mbit/s input port reference point ER. Parameter Value for 2 Mbit/s tributary input ports Interface •...
® Tellabs 6325 Edge Node 3 Reference Information Parameter Value for 2 Mbit/s tributary output ports Peak voltage mark • 2.37 V +/- 10% (Coaxial pair - 75 Ohm) • 3.00 V +/- 10% (Symmetrical pair - 120 Ohm) Pulse shape Table 6 /G.703, Figure 15 /G.703...
Page 57
® Tellabs 6325 Edge Node 3 Reference Information Parameter Reference Value for 2 MHz synchronization output port Return loss EN 300 166 • >6 dB @ 51-102 kHz • >8 dB @ 102-3072 kHz Voltage at < 40 mV @ 50 kHz to 6.144 MHz...
Page 58
® Tellabs 6325 Edge Node 3 Reference Information Parameter Reference SETG output Change of clock EN 300417-1 The change-over of synchronization source from one source to another (each traceable to the same PRC) shall be performed so that the resultant fre-...
® Tellabs 6325 Edge Node 3 Reference Information The following table describes the specifications for the synchronization func- Synchronization function tion in free-running mode. in free-running mode Parameter Reference SETG output Frequency Stability Frequency offset EN 300 462-5 +/- 4.6 ppm for ap- proximately 10 years.
2-way configurable control 3V CMOS level. Can source signals and sink 10 mA as output For configuration of the AUX ports, please refer to the manual for Tellabs 6300 manager [1]. 3.5.5 Power The table lists the AC power specifications.
Mechanical The dimensions on the Tellabs 6325 node are shown in the figure below. Dimensions on the Tellabs 6325 node The dimensions on the modules for Tellabs 6325 node are shown in the table Dimensions on modules below. Module Height (mm)
Page 62
There is no air filter installed in the Tellabs 6325 node. Air filter The Tellabs 6325 node is not designed for transport installed in a rack, as this Transport may damage the mechanics. It is recommended to use the factory supplied packaging.
Page 63
® Tellabs 6325 Edge Node 3 Reference Information The figure shows the pin designations of the connectors on the modules. Pin designations MA365 • Rev. A2...
Page 64
® Tellabs 6325 Edge Node 3 Reference Information The figure shows the E1 connector on the PIM1 module. Pin designations on PIM1 connector and color coding of the E1 cable The pin designation of the E1 connector on the PIM1 module and the color coding of the E1 open ended cable (WK-503Y-zz.z-01) is listed in the following...
Page 65
® Tellabs 6325 Edge Node 3 Reference Information Solid Solid Channel Binder signal signal Color Color Yellow RX12 Grey RX12\ White Yellow TX12 Blue TX12\ Brown RX13 Blue RX13\ White Brown TX13 Orange 76 TX13\ White Brown RX14 Green RX14\...
Page 66
® Tellabs 6325 Edge Node 3 Reference Information The color coding of the open ended cables are listed in the following table. Color coding of open ended cables The coding of the cable WK-503Y-zz.z-01 is listed in ‘Pin designations Note: on PIM1 connector and color coding of the E1 cable’...
Page 67
® Tellabs 6325 Edge Node 3 Reference Information The rating information for the cables for the Tellabs 6325 node are listed in the Rating information for following table. The temperatures are shown in ° C. cables Wire Rated Flammability Item number...
The temperature range is limited to -5 ° C to +55 ° C in case of when using AC supply, when using CWDM transceivers or when using STM-16 trans- ceivers. The table specifies climatic and mechanical conditions of the Tellabs 6325 Climatic and mechanical node during storage, transport and operation.
Page 69
® Tellabs 6325 Edge Node 3 Reference Information Parameter Storage and Transportation In use Shock Shock spectrum type I Shock spectrum type L 11 ms 100 m/s 22 ms 40 m/s Fall 1.2 m Test severities according to EN 300 019-2:...
® Tellabs 6325 Edge Node 3 Reference Information The table specifies the test sequence for in use. Test sequence in use Parameter Severity Reference Low temperature when AC powered IEC 60068-2-1 Ad -5 ° C, 16 h when DC powered -40 °...
Page 71
® Tellabs 6325 Edge Node 3 Reference Information Phenomenon Limits Reference Conducted RF voltage EN 55022 0.15 - 30 MHz 0.15 - 0.5 - 5.0 - 30 MHz Class B Quasi peak det. 66 - 56 - 56/60 - 60 dBµV Average det.
Page 72
® Tellabs 6325 Edge Node 3 Reference Information Phenomenon Test Level Performance Reference Surge Transients 1 kV line to line EN 61000-4-5 rise time 1.2µs 2 kV line to decay time 50µs ground 2 kV line to line 4 kV line to ground Specifications for DC power supply ports.
5 of this document. • EN 60950-1: Safety of information technology equipment. It is only the optical interfaces of the Tellabs 6325 node, that are intended to be Connections connected to interfaces of public telecommunications networks.
Calculation method models contained in section 7 of [56], using the Black Box technique, as de- scribed in section 3.1 of [56]. The table specifies the MTBF values for the Tellabs 6325 node items. MTBF values Item MTBF (years) (total) 256.7...
® Tellabs 6325 Edge Node A Packing Instructions Packing Instructions This appendix describes the recommended procedures to follow when pack- Overview ing modules for shipment. It is recommended to use the original packing material from the factory. But Use original packing...
Page 76
® Tellabs 6325 Edge Node A Packing Instructions Step Action Place the module in the antistatic bag. Only one module per bag Note: Unfold/assemble the carton-box Place the lower part of the foam supporting pad in the bottom of the box.
Page 77
® Tellabs 6325 Edge Node A Packing Instructions Step Action Place the module with the top side up into the box, carefully wrap- ping the antistatic bag around the module. Only one module per box Note: Place the upper part of the foam supporting pad in the box.
Page 78
® Tellabs 6325 Edge Node A Packing Instructions Step Action Close the box Use tape if necessary to ensure that the box stays closed during trans- portation. MA365 • Rev. A2...
Need help?
Do you have a question about the 6325 and is the answer not in the manual?
Questions and answers