Download Print this page

HP Altoline 6921 Quick Start Manual

48sfp+ 6qsfp+ x86 onie ac switch

Advertisement

Quick Links

HPE Altoline 6921 48SFP+
6QSFP+ x86 ONIE AC
Switch

Quick Start Guide

© Copyright 2016 Hewlett Packard Enterprise Development LP
The information contained herein is subject to change without notice.
Documentation feedback
Send any errors, suggestions, or comments to Documentation
Feedback (docsfeedback@hpe.com).
Part Number: 5200-1162
Published: April 2016
Edition: 1
Printed in Taiwan
E042016-AP-R01
*5200-1162*
150200001459A R01
Step 1: Unpack the switch and check
contents
1
5
1
HPE Altoline 6921
48SFP+ 6QSFP+ x86
ONIE AC Switch
3
Country-specific power
cord(s)
5
Documentation—Quick Start Guide (this document) and
Safety and Regulatory Information
NOTE:
The switch has the Open Network
Installer Environment (ONIE) software pre-
loaded, but no switch software image pre-loaded.
CAUTION:
The switch includes plug-in power
supply and fan tray modules that are installed into
its chassis. All installed modules must have a
matching airflow direction. That is, all modules
must have a front-to-back (F2B) airflow direction,
or all modules must have a back-to-front (B2F)
airflow direction. The airflow direction of fan trays
is indicated by text printed on the modules.
Step 2: Mount the switch
1
Attach the brackets to the switch.
2
Use the screws supplied with the rack to secure the
switch in the rack.
CAUTION:
Installing the switch in a rack
requires two people. One person should position
the switch in the rack, while the other secures it
using the rack screws.
2
4
3
2
Rack mounting kit — 2
brackets and 8 screws
4
Console cable — RJ-45
to DB-9
2
1

Advertisement

loading

Summary of Contents for HP Altoline 6921

  • Page 1: Quick Start Guide

    Step 1: Unpack the switch and check contents HPE Altoline 6921 48SFP+ 6QSFP+ x86 ONIE AC HPE Altoline 6921 Rack mounting kit — 2 Switch 48SFP+ 6QSFP+ x86 brackets and 8 screws ONIE AC Switch Country-specific power Console cable — RJ-45...
  • Page 2 Step 3: Connect power Step 6: Connect network cables Install one or two universal AC power modules in the switch. For the RJ-45 Management port, connect 100-ohm The switch supports up to two PSUs that must have the Category 5, 5e or better twisted-pair cable. same matching airflow direction as the installed fan tray.
  • Page 3: Hardware Specifications

    Hardware specifications Installation precautions Switch Chassis Warnings • The rack or cabinet should be adequately secured to Size (WxDxH) 442.5 x 473 x 43.95 mm (17.42x 18.62 x 1.73 prevent it from becoming unstable, tilting, or falling. inches) • Devices installed in a rack or cabinet should be mounted as low as possible, with the heaviest devices at the bottom Weight 8.95 kg (19.73 lb), with two installed PSUs...
  • Page 4: Japan Power Cord Warning

    CAUTION Disconnect all power supply cords before servicing. Débranchez tous les cordons d'alimentation avant l'entretien. Japan power cord warning China altitude warning 仅适用于海拔 2000 米以下地区安全使用 Russia/Belarus/Kazakhstan/CEE safety HPE USA corporate address Hewlett Packard Enterprise 3000 Hanover Street, Palo Alto, California, 94304 U.S.A. GNU General Public License notice This product includes code licensed under the GNU General Public License, the GNU Lesser General Public License, and/or...