Final Checks And Trial Operation - Samsung RHF025EE Series Installation Manual

Erv energy recovery ventilator
Hide thumbs Also See for RHF025EE Series:
Table of Contents

Advertisement

Final Checks and Trial Operation

Check the follows after the installation.
 Installation location and its strength
 Inspection hole installation
 Wiring
 Insulation
 Check the operating condition and damper operation.
Setup the ERV wired remote control
Function
Air volume
Turbo, High, Low Check the airflow from
Heat-EX mode
By-Pass mode
Turbo, High, Low
- If an error occurs during trial operation, check out the wiring.
Turn off the sub power supply and carry out the wiring work again.
- After the trial operation, explain how to use the ventilator to the user and
hand over the product with the user's manual.
Checks
Operating condition
Damper operation
Located on the
corner (Open)
outdoor air suction duct
and air outlet is controlled
Located on side
by Turbo, High, Low.
(Closed)
29
E-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents