Getting Started; Initial Inspection; Package Contents Checklist - Agilent Technologies U2000H Operating And Service Manual

U2000 series usb power sensors
Hide thumbs Also See for U2000H:
Table of Contents

Advertisement

Getting Started

Initial Inspection

Inspect the shipping container for damages. If the shipping container or
packaging material is damaged, it should be kept until the contents of the
shipment have been checked mechanically and electrically. If there is any
mechanical damage, notify the nearest Agilent Technologies office. Keep the
damaged shipping materials (if any) for inspection by the carrier and a Agilent
Technologies representative. If required, you can find a list of Agilent
Technologies Sales and Service offices on the last page of the guide.

Package Contents Checklist

Inspect and verify the following items for the standard purchase of the U2000
Series USB power sensors. If there are missing items, contact the nearest
Agilent Sales Office.while
U2000 Series Operating and Service Guide
Trigger cable BNC Male to SMB female 50 Ω, 1.5 m, U2000- 60005
Power sensor cable: 1.5 m (U2000- 60002), 3.0 m (U2000- 60003), or 5.0 m
(U2000- 60004)
U2000 Series USB Power Sensor Programming Guide, U2000- 90411
U2000 Series USB Power Sensor Operating and Service Guide (English),
U2000- 90405
U2000 Series USB Power Sensor Documentation CD, U2000- 90002
N1918A Power Analysis Manager Assembly, N1918- 60001
Introduction
1
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

U2001bU2002hU2000a

Table of Contents