Gain Check Setup; Energy-Measuring Setup; Energy Zero Clearance; System Test - JVC KD-SV3204UI Service Manual

Vcd/cd receiver
Hide thumbs Also See for KD-SV3204UI:
Table of Contents

Advertisement

Https://www.bueno-electric.com
After finishing check it returns to "energy-measuring setup

2.2.6.3.2 Gain check setup

select the " gain check" menu, after entering the secret codes, a waiting notice is shown .
After finishing the check a display for the completion is seen and it returns to the menu

"energy-measuring setup"

2.2.6.3.3 Energy-measuring setup
Select the menu "save setup", enter the secret codes and finish the zero clearance

2.2.6.3.4 Energy zero clearance

Select the menu "energy zero clearance", enter the secret codes and finish zero clearance.

2.2.7 System test

A set of the interaction block is provided in the BEPR- 800 Series Digital Protection. By
operating this set of the interaction block. Users can perform the tests on the switch out (relay)
drive, switch-in real-time display (manual detection of the switch-in signals), real-time display of
the analog variables in the AC input channels and the related functions for the integrated
automation. Since this set of operations is generally used to test the perfect state of the definitions
for the protection, monitoring and telecontrol back ground data bases, it is called the "system test"
Contact: sales@bueno-electric.com
Offset shift check
Offset shift check is going on !
Wait a moment...
Offset shift check
Offset shift check is finished
Gain check
Gain check is going on !
Wait a moment
Gain check
Gain check finished
Check results
33
BUENO ELECTRIC
BUENO ELECTRIC
BUENO ELECTRIC
BUENO ELECTRIC
Fax: +86-25-51816989

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kd-sv3205unKd-sv3205uKd-sv3205utKd-sv3205uh

Table of Contents