ABB A155-M57 Operation Manual page 56

Hide thumbs Also See for A155-M57:
Table of Contents

Advertisement

Operation Manual / 4 Product description / A150-M.. - A155-M..
3
Commissioning
Check whether the compressor wheel cooling is fitted on the bearing casing.
3.2.3
Checks after commissioning (engine in idle mode)
Lubricating system
Keep to the lubricating oil pressure at the inlet.
Keep to the lubricating oil temperature at the inlet.
Refer to chapter Monitoring operation [➙ 27] for admissible values.
Gas, air and oil pipes
After starting the engine, check all gas, air and oil pipes for leaks.
3.2.4
Checks when starting up the engine
Measure speed, oil pressure and charging pressure at various engine performances.
Measure the exhaust gas temperature before and after the turbine.
Measure the air temperature before and after the compressor.
Compare the measured values with the values of the acceptance certificate. Different op-
erating conditions indicate a malfunction (see chapter Eliminating malfunctions [➙ 59]).
Escape of oily fluids
Lubricants and pastes used during assembly can liquefy or vaporise and es-
cape as oily fluids during the initial hours of operation. Continual escape of
NOTICE
an oily fluid indicates an oil leak.
If there is a leak, contact an ABB Turbocharging Service Station.
© Copyright 2017 ABB. All rights reserved.
HZTL4032_EN
Page 24 / 120
Revision F
January 2017

Advertisement

Table of Contents
loading

Table of Contents