Sime Murelle Pro 25 LPG Use, Installation & Servicing Instructions

Sime Murelle Pro 25 LPG Use, Installation & Servicing Instructions

Condensig wall mounted boiler
Table of Contents

Advertisement

Quick Links

Cod. 6316191 - 08/2013
Cod. 6316191 - 08/2013
6318143C - 10/2015 - R0
Cod. 6316191 - 08/2013
UK
UK
BRAVA DGT HE
BRAVA DGT HE
BRAVA DGT HE
Condensing wall mounted boiler
25 - 30 - 35
Murelle Pro 25 lPG
25 - 30 - 35
25 - 30 - 35
INSTALLATION AND SERVICING INSTRUCTIONS
INSTALLATION AND SERVICING INSTRUCTIONS
User, installation and servicing instrUctions
Cod.
ENSURE THAT THESE
ENSURE THAT THESE
ENSURE THAT THESE
INSTRUCTIONS ARE LEFT
INSTRUCTIONS ARE LEFT
INSTRUCTIONS ARE LEFT
FOR THE USER AFTER
FOR THE USER AFTER
FOR THE USER AFTER
COMPLETION OF THE
COMPLETION OF THE
COMPLETION OF THE
BENCHMARK SECTION
BENCHMARK SECTION
BENCHMARK SECTION
PLEASE READ THE
PLEASE READ THE
PLEASE READ THE
IMPORTANT NOTICE
IMPORTANT NOTICE
IMPORTANT NOTICE
WITHIN THIS GUIDE
WITHIN THIS GUIDE
WITHIN THIS GUIDE
REGARDING YOUR BOILER
REGARDING YOUR BOILER
REGARDING YOUR BOILER
WARRANTY
WARRANTY
WARRANTY
199838
199838
199838
199838
BoileR Details
please position here a sticker
from installation pack

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Murelle Pro 25 LPG and is the answer not in the manual?

Questions and answers

Summary of Contents for Sime Murelle Pro 25 LPG

  • Page 1 BRAVA DGT HE BRAVA DGT HE BRAVA DGT HE Condensing wall mounted boiler 25 - 30 - 35 Murelle Pro 25 lPG 25 - 30 - 35 25 - 30 - 35 LLATION AND SERVICING INSTRUCTIONS INSTALLATION AND SERVICING INSTRUCTIONS...
  • Page 2: Safe Handling

    For the first year all of our appliances are protected by our manufacturer’s guarantee which covers both parts and labour. As you would expect from Sime Ltd, it is our aim to provide our valued customers with the best in after sales and service.
  • Page 4 The Benchmark Scheme Sime is a licensed member of the Benchmark Scheme which aims to improve the standards of installation and com- missioning of domestic heating and hot water systems in the UK and to encourage regular servicing to optimise safety, efficiency and performance.
  • Page 5 – Do not use electrical devices or appliances such – the appliance must be used as intended. sime as switches, electrical appliances etc if you can declines all responsible for any injury or damage smell gas.
  • Page 6 Murelle Pro 25 lPG 8112111 47-283-48 (G31) User instrUctions Table of conTenTs compliance our company declares that murelle pro lpg boilers comply with the following directives: description of the appliance –...
  • Page 7 User instrUctions table of contents oPeraTinG The Murelle Pro 25 lPG MainTenance Control panel ........8 servicing.
  • Page 8: Control Panel

    25 lpg display control panel . this symbol appears when the boiler is “sUmmer” operating in summer mode or if only the domestic hot water mode is enabled via the remote control. if the symbols are flashing, this indicates that the chimney sweep function is active.
  • Page 9: Ignition

    ignition programming mechanical time clock after having carried out the preliminary checks, proceed as setting the time follows: the time of day can be set by grasping the outer edge of – set the main system switch to "oN" the grey dial and turning it in a clockwise direction until the –...
  • Page 10: Fault / Malfunction Codes

    fault / malfunction codes if a fault/malfunction is detected during boiler operation, the message “al” will appear on the display followed by the fault code (eg. “06” - no flame detected). if the message “reset” also appears, press and hold the button for more than 3 seconds and check that the normal operating condition is restored.
  • Page 11: Table Of Contents

    description of the appliance table of contents sensors........15 descriPTion of The aPPliance expansion vessel .
  • Page 12: Description Of The Appliance

    – the atmospheric burner combined with a copper heat...
  • Page 13: Structure

    structure Dual sensor (thermal safety/delivery) Combustion chamber ignition/detection electrode Diverter valve Domestic hot water sensor (ss) Control panel secondary heat exchanger Gas valve Domestic water filter and flow regulator system relief valve Boiler drain Pump Water pressure switch automatic bleed valve Burner Primary heat exchanger expansion vessel...
  • Page 14: Technical Features

    25 lpg certifications country of intended installation fuel pin number 1312CP5935 category type C12 - C32 class no 3 (< 150 mg/kWh) heating performance heat inpUt nominal 25.5 minimum heat oUtpUt nominal (80-60°c) 23.7 min useful efficiency (80-60°c) efficiency max useful efficiency (80-60°c)
  • Page 15: Main Water Circuit

    main water circuit sensors the sensors installed have the following characteristics: – Dual sensor (thermal safety/output) NtC R25°C; 10kΩ – domestic hot water sensor NtC R25°C; 10kΩ – external sensor NtC R25°C; 10kΩ correspondence of temperature detected/resistance examples of reading: tR=75°C →...
  • Page 16: Circulation Pump

    Knobs circulation pump the flow-head performance curve available for the heating the heating knob allows the user to set the heating system is shown in the graph below. temperature to between 20 and 80°C during normal operation (Default PaR ts1.3 / 1.4). residUal head (mbar) the domestic hot water knob allows the user to set the domestic hot water temperature to between 10 and...
  • Page 17: Wiring Diagram

    – Connect the earth wire to an effective earthing system. sime declines all responsible for any injury or damage to persons, animals,or property as a result of failure to provide adequate earthing...
  • Page 18 The Benchmark Scheme Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are provided with the correct equipment for their needs, that it is installed, commis- sioned and serviced in accordance with the manufacturer’s instructions by competent persons and that it meets the require- ments of the appropriate Building Regulations.
  • Page 19: Table Of Contents

    installation and servicing instrUctions Installer Checklist Please remember to carry out the following checks after installation. This will achieve complete customer satisfaction, and avoid unnecessary service calls. A charge will be made for a service visit where the fault is not due to a manufacturing defect.
  • Page 20: Installation

    installation receiving the product murelle pro lpg description appliances are delivered in a single unit murelle pro lpg W (mm) protected by cardboard packaging. D (mm) H (mm) Weight (kg) handling once the packaging has been removed, the appliance is to be handled manually, tilting it slightly, lifting it and applying pressure in the points indicated in the figure.
  • Page 21: Cleaning The System

    Naturally soft water areas can corrode aluminium heat exchangers. adding Fernox F1 or Mb-1 will guard against corrosion. – sime promote the fitting of tF1 system filter with any new ≥ 2 boiler installation. – it is important to check the inhibitor concentration after installation, system modification and annually on a service visit in accordance with the manufacturer’s instructions.
  • Page 22: Plumbing Connections

    caUtion 6.10 gas supply – the boiler should be located observing the boilers leave the factory prearranged for gas murelle pro lpg required clearances, and provide safe, adequate G31. service access. the gas connection must be made using seamless steel or copper tube.
  • Page 23: Connecting The Flue

    warnings 6.11 connecting the flue – the smoke flue and the connection to the flue pipe must be in compliance with the national and local caUtion standards and legislation in force. – the appliance must be installed as a room sealed –...
  • Page 24: Installation Of Coaxial Flues 60/100Mm - 80/125Mm

    Avoid using oils and greases. Length of pipe Ø 60/100 Model Min. Max. Murelle Pro 25 LPG LIST OF ø 60/100 ACCESSORIES x + y = L (m) Coaxial duct kit L. 790 code 8084811 Extension L.
  • Page 25: Electrical Connections And External Controls

    3 amps. if this cable needs to be replaced, an original spare must be requested from sime . the heating control of the boiler can be achieved by connection of either a volt free room thermostat, room thermostat/timer or a dedicated control (listed below).
  • Page 26: External Sensor

    (see section “wiring diagram” ) or power supply through a fused mains switch, with by use of a dedicated sime Remote Control (Home or Home at least 3mm spacing between contacts, fused at Plus). the boiler will automatically detect when a dedicated 3amps control is connected.
  • Page 27: Refilling Or Emptying

    mUlti zone system - with pump, air thermostat and 6.14.1 system filling external sensor. remove the front panel: – remove the two screws (1), pull the front panel (2) forwards and release it from the top by lifting it. Fig. 28 Fig.
  • Page 28: 6.14.2 Emptying Operations

    – check the pressure on the pressure gauge (5) and if 6.14.2 emptying operations necessary top up until the correct pressure reading appears – close the automatic bleed valve (3). domestic hot water circuit: – close the domestic hot water circuit isolation valve (4) Refit the front panel of the boiler hooking it on at the top, –...
  • Page 29: Commissioning

    commissioning – close the taps opened previously and check that the preliminary operations appliance shuts down – press the button once to select "WiNteR mode" . the Before commissioning the appliance, check that: value of the heating water temperature detected at that –...
  • Page 30: List Of Parameters

    When all the parameter modifications have been made, exit the parameter menu by pressing and holding down the buttons < for approximately 5 seconds at the same time until the initial screen is displayed. list of parameters type description range step default configUration...
  • Page 31: Fault / Malfunction Codes

    in the event of a fault/malfunction the message “al” will display of operating data and counters appear on the display alternating with the alarm number eg. access the operating data “in” and the counters “co” as (Domestic Hot Water sensor Fault). “al 04”...
  • Page 32: Checks And Adjustments

    table of coUnter displayed – remove the screws (3) securing the control panel (4) – move the panel (4) upwards (a) but keeping it in the side type description range step guides (5) to the end of travel 0.1; from 0.0 total no.
  • Page 33: Adjusting Gas Pressure At The Nozzles

    (mbar) model heat output 35,8 - 36,2 murelle pro 25 lpg 3,9 - 4,2 if the gas pressure values are different from the values indicated in the table, adjust the gas nozzle pressure as – close the valves which were opened previously.
  • Page 34: Automatic Calibration Procedure

    automatic calibration procedure – press the button to confirm (approximately 3 seconds) and access the default value which is flashing this procedure MUst Be CaRRieD oUt after replacing: – the nozzles for gas conversion – the gas valve following a fault –...
  • Page 35 35,8 - 36,2 adjusting minimum gas pressure: murelle pro 25 lpg – press the button twice, the message "P00" will appear 3,9 - 4,2 on the display – press the buttons >...
  • Page 36: Maintenance

    maintenance servicing burner inspection as a condition of the warranty and to ensure correct operation 8.3.1 cleaning the heat exchanger and efficiency, it is important that the boiler is serviced every 12 months, within 30 days of the anniversary of the installation to clean the heat exchanger: date ensure the required information is recorded in the Gas –...
  • Page 37: Cleaning The Burner

    – remove the four screws (3) and remove the front panel (4) 8.3.4 final operations from the combustion chamber (6) working carefully so as after having cleaned the heat exchanger and the burner: not to damage the gasket or the panel insulation –...
  • Page 38: Circuit Board Replacement

    - set the parameter ts 0.4 type description configuration of murelle pro 25 lpg (Combustion configuration) the open / sealed index showing boiler power to 0 chamber in kW Fault regarding 1 = 25...
  • Page 39: Gas Boiler System Commissioning Checklist

    GAS BOILER SYSTEM COMMISSIONING CHECKLIST This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission according to the manufacturer’s instructions and complete this Benchmark Commissioning Checklist will invalidate the warranty.
  • Page 40 SERVICE RECORD It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed. Service Provider Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s instructions. Always use the manufacturer’s specified spare part when replacing controls.
  • Page 41: Exploded Views

    eXploded views...
  • Page 44 Murelle Pro Murelle Pro Pos. Code Description Pos. Code Description 25 LPG 25 LPG 6264560 Boiler fixing bracket 6087332 Motor for diverting valve 6317601 Sealed chamber rear panel 6063602 Gas cock 3/4X1/2F 6229838 Gasket for sealed chamber 6265655 10 plate-type heat exchanger 5183728 Rectang.
  • Page 48 Sime Ltd 1a Blue Ridge Park Thunderhead Ridge Glasshoughton, Castleford, WF10 4UA Phone: 0845 9011114 Fax: 0845 9011115 www.sime.co.uk Email: enquiries@sime.co.uk...

Table of Contents